- 1、本文档共115页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程概况与工程分析 - World bank uments.doc
WORLD BANK PROJECT
ENVIRONMENT IMPACT ASSESSMENT REPORT FOR
URUMQI DISTRICT HEATING PROJECT
SHAYIBAKE DISTRICT HEATING NETWORK COMPONENT
Xinjiang Environmental Technology Consulting Center
2011.1
Project Name: Urumqi District Heating Project
Project Leader: Xu Yan (Certificated EIA Engineer: A40040130600)
EIA Team:: Xinjiang Environmental Technology Consulting Center
Legal Representative: Zhou Wei
CONTENTS
PREFACE 3
1. INTRODUCTION 4
1.1 Background 4
1.2 EIA Overview 4
1.3 Assessment Scope, Protection Objectives, Period and Key Issues 5
1.4 Relevant Laws, Regulations, Technical Guidelines and Standards 6
2. PROJECT DESCRIPTION 10
2.1 Project Overview 10
2.2 Construction Contents 11
2.3 Associated Facilities and Activities 16
3. ENVIRONMENTAL AND SOCIETAL BASELINE 17
3.1 Natural Environment and Environmental Quality 17
3.2 Societal and Economic Status 28
3.3 Current Air Pollution Control and Management 30
3.4 Respiratory Disease Status 36
3.5 Key Environmentally Sensitive and Social Protection Areas 37
4. ENVIRONMENTAL IMPACT ASSESSMENT 41
4.1 Impact Assessment during the Construction Phase 41
4.2 Impact Assessment during the Operation Phase 46
4.3 Cumulative impacts of the two components 50
5. INFORMATION DISLOSURE AND PUBLIC CONSULTATION 52
5.1 Objectives, Scope and Approaches 54
5.2 Process of Announcement and Consultation 54
5.3 Results and Feedbacks 59
5.4 Conclusions of Public Consultation 61
6. ANALYSIS OF ALTERNATIVES 63
6.1 Alternatives of “With” and “Without” Project 63
6.2 Alternatives of Project Locations 63
6.3 Alternatives of Technology and Techniques 65
6.4 Alternatives of Heating Fuels 66
7 ENVIRONMENTAL MANAGEMENT PLAN 68
7.1 Organizations and Responsibilities 68
7.2 Mitigation Measures 71
7.3 Environmental Monitoring Plan and Budget 78
7.4 Environmental Training Program 80
7.5 Supervision and Reporting Mechanisms 81
8. ASSOCIATED FACILITIES AND ACTIVITIES 86
8.1 Heat Sources Error! Bookmark not defined.
8.1 Current Status of Heat Sources and the
您可能关注的文档
- 食品加工与保藏原理(双语).doc
- 普通生物学笔记(陈阅增)(Notes on General Biology (Chen Yuezeng) ).doc
- 数据库课程设计--旅行社管理系统.docx
- -TPY-型 自动椭圆偏振测厚仪说明书.doc
- 五机架冷连轧机组设备及管道安装施工组织设计.doc
- [最新]经济类数学 线性代数。第二章习题谜底.doc
- 雅思sxlqtw雅思长难句分析(IELTS, sxlqtw, IELTS, difficult sentences, analysis).doc
- MCM-分子筛吸附剂的制备及其在模拟汽油脱硫中的性能.doc
- 初中《道德与法治》整体知识框架.doc
- 高考英语听力原文及写作范文-.doc
最近下载
- 《海洋科学导论》第1章-绪论-海洋探索史.pptx
- GB50367-2013 混凝土结构加固设计规范.pdf
- 湖南省名校联考2024-2025学年高二上学期12月大联考英语试题含答案.docx VIP
- 橙色插画风《 糖果屋》童话故事PPT模板.pptx
- 国有企业职工国有企业人事主管岗面试题库参考答案和答题要点.docx VIP
- 博莱特空压机使用说明书.pdf
- 宜家供应链案例分析.docx VIP
- 计算机毕业设计java图书借阅系统ssmjsp论文.docx
- 年辽宁省高考作文分析与优秀范文.doc VIP
- 苏少版美术四年级下册 12.儿歌与童话 课件 (19张PPT)(含音频+视频).pptx VIP
文档评论(0)