- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
中国电力工业市场化改革的问题及展望(Problems and prospects of Chinas power industry market reform).doc
中国电力工业市场化改革的问题及展望(Problems and prospects of Chinas power industry market reform)
Problems and prospects of Chinas power industry market reform
Cycle
Two years seven, August
I. current situation of Chinas power industry
(I) power generation
By the end of 2006, the countrys installed capacity of power generation reached 622 million kilowatts, ranking second in the world. Of which 128 million 570 thousand kilowatts of hydropower, accounted for 20.67% of total capacity; 484 million 50 thousand kilowatts of thermal power, accounting for 77.82% of the total capacity of 6 million 850 thousand kilowatts; nuclear power, accounting for 1.10% of the total capacity of 1 million 870 thousand kilowatts; wind power generation, accounting for 0.30% of total capacity; and other biomass power generation 660 thousand kilowatts, accounting for 0.11% of total capacity.
In 2006, the national generating capacity reached 28344 kwh, an increase of 13.4%, power supply capacity and further enhance the power equipment utilization hours continued since the beginning of the fourth quarter of 2005 decreased, and more than 6000 kilowatts of power plant utilization hours of 5221 hours, down 3.7%.
The main generation market has diversified, forming a competitive pattern. At present, more than 4000 power generation enterprises of 6000 kilowatts and above are in china. Its state-owned enterprises and state-owned enterprises account for about 90%. Huaneng, Datang, Huadian, Guodian and CLP directly under the central 5 power group accounted for about 38.79% of the total installed; State Development Investment Corp, the Shenhua Group, the Three Gorges project development company, China Nuclear Power Corporation, Guangdong Nuclear Power Group Corporation, China Resources Power Holdings Co and other central power generation enterprises accounted for about 10% of the total installed capacity for power generation enterprises; the total installed capacity of 45%; private and foreign power enterprises accounted
您可能关注的文档
- 什么是科学技术史(What is the history of science and technology).doc
- ted英语演讲稿:how i held my breath for minutes如何憋气.doc
- 车牌识别出入口管理系统(ACS版).doc
- 中国古代散文最远可追溯 (字).doc
- vc 扫雷 源码(VC Minesweeper source).doc
- Fulfilling Lives - Brighter Futures:充实的生活更加光明的未来.docx
- 职业女性生孩子的代价(The cost of career women's children).doc
- 新时代交互英语视听说级dialogue.doc
- 南斯拉夫联盟共和国宪法(年)(Constitution of the Federal Republic of Yugoslavia ).doc
- 自考中国古代文论选读必考试题.docx
- 第18讲 第17课 西晋的短暂统一和北方各族的内迁.docx
- 第15讲 第14课 沟通中外文明的“丝绸之路”.docx
- 第13课时 中东 欧洲西部.doc
- 第17讲 第16 课三国鼎立.docx
- 第17讲 第16课 三国鼎立 带解析.docx
- 2024_2025年新教材高中历史课时检测9近代西方的法律与教化含解析新人教版选择性必修1.doc
- 2024_2025学年高二数学下学期期末备考试卷文含解析.docx
- 山西版2024高考政治一轮复习第二单元生产劳动与经营第5课时企业与劳动者教案.docx
- 第16讲 第15课 两汉的科技和文化 带解析.docx
- 第13课 宋元时期的科技与中外交通.docx
最近下载
- 机械制造基础-全套PPT课件.pptx
- 地域建筑的分析__--__纳西族传统民居的现代启示.pdf
- 湖北省武汉市2023-2024学年六年级上学期语文期中试卷(含答案).pdf VIP
- 露天非煤矿山企业重大事古隐患认定目录及企业待检资料清单.doc
- 网络工程师职业规划4篇.pdf VIP
- 四年级音乐上册 牧童ppt课件1 人教新课标版.ppt
- 浙教版(2023)信息科技三上第2课感知智能生活教案.pdf VIP
- 中央空调节能运行管理.ppt
- 河北省石家庄市第四十一中学教育集团2023-2024学年七年级上学期期中历史试题(1).docx
- 《什么是冬天》儿童绘本故事演讲ppt课件(图文).ppt
文档评论(0)