黄河拉西瓦水电站2#尾水洞出口预应力砼叠梁施工几点见解.docVIP

  • 2
  • 0
  • 约4.19千字
  • 约 9页
  • 2018-06-05 发布于福建
  • 举报

黄河拉西瓦水电站2#尾水洞出口预应力砼叠梁施工几点见解.doc

黄河拉西瓦水电站2#尾水洞出口预应力砼叠梁施工几点见解

黄河拉西瓦水电站2#尾水洞出口预应力砼叠梁施工几点见解   摘要:本文介绍了黄河拉西瓦水电站,2#尾水洞出口预应力砼叠梁闸门工程施工中的几个难点和特点,针对具体情况,对其进行了分析研究,制定了一系列解决措施和方案,通过工程的施工期间的探索,总结了一些提供施工质量的先进经验,较好的完成了预应力砼叠梁闸门工程。   关键词:预应力叠梁闸门精度控制质量保证   Abstract: this paper introduces the Yellow River lashiwa hydropower station, 2 # of the tailrace tunnel export prestressed concrete beam in the construction of the project of the few difficulties and characteristics, and the specific situation, analyzed research, formulated a series of measures and solutions, through the engineering construction during the period of exploration, summarizes some provide the advance

文档评论(0)

1亿VIP精品文档

相关文档