- 18
- 0
- 约7.67万字
- 约 17页
- 2018-06-07 发布于福建
- 举报
澳大利亚国家数字模拟指南 案例National Guidelines for Digital Modelling Case Studies3
Case study 3:
1 Bligh Street
3D render of 1 Bligh Street building within its context
Image courtesy Architectus and Ingenhoven Architects
This case study discusses the experiences of consultants and contractor as they
undertake their irst multidisciplinary Building Information Modelling (BIM) project.
The project is a premium CBD high-rise ofice building located in a top location in Sydney.
Case Study 3: 1 Bligh Street 23
Project overview
1 Bligh Street is a 30–storey, premium CBD high-rise ofice
building, located in a prominent location in Sydney. On
completion, 1 Bligh Street will be a 42,000 m2 development,
with an estimated cost of AUD$230 million. The building has
the potential to achieve a 5-star ABGR (Australian Building
Greenhouse Rating) and 6-star Green Star Rating without
sacriicing indoor environment quality.
1 Bligh Street is one of the irst commercial projects in
Australia to implement multidisciplinary BIM collaboration. BIM
played an important role in the documentation and simulation
of the project, which contributed to its distinctive design and
ambitious performance. The use of BIM was set as a client
requirement, and was included in the contract. Ultimately,
the client plans to use the as-built BIM model for facility
management purposes.
1 Bligh Street is located at the ‘valley’ created by the
Macquarie Street ridge and the tall buildings in and around
George Street.
The site context and its potentially wide range of far-reaching
views were an important fact
您可能关注的文档
最近下载
- 2025-2026学年小学劳动人美版2024五年级下册-人美版(2024)教学设计合集.docx
- 2025年青岛酒店管理职业技术学院单招笔试英语试题库含答案解析.docx VIP
- 海藻学-3.pdf VIP
- 东风天龙电气系统维修.ppt VIP
- 2026人教版小学语文四年级上册期末考试精选3套试卷(含答案解析).pdf
- 《出纳实务》高职财经专业全套教学课件.pptx
- 毕业论文的答辩与评价.ppt VIP
- 药品质量研究的内容与药典概况详解.ppt VIP
- 西门子通风控制器acx36介绍.pdf
- 2024年青岛酒店管理职业技术学院高职单招(英语/数学/语文)笔试历年参考题库含答案解析.docx VIP
原创力文档

文档评论(0)