- 1、本文档共169页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
CMMI概述
* * * * * * * * * * * * In Fig 3 we can find the lack of communication is the primary cause of schedule variance. In fact this data comes from the beginning of design phase in the project. Designers and requirement engineers didn’t reach agreement and consistency with each other about the requirement, which led to a lot of reworks. For other abnormal signals in the control chart, we can do similar analysis. In this example, there are only two SPI data that is 1.0 exactly. If we don’t applied SPC, we must analyze all the 16 data that not equal 1.0, the incurred cost will increase dramatically. * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * SG 1 量化管理项目 SP 1.1 建立项目目标 SP 1.2 建立项目定义过程 SP 1.3 选择受控子过程 SP 1.4 管理项目性能 * * SG 2 统计管理子过程性能 SP 2.1 选择度量及分析技术 SP 2.2 应用统计方法理解偏差 SP 2.3 监控子过程性能 SP 2.4 记录统计管理数据 量化项目管理实例: Process: Coding Process Performance: Schedule Indicator: Relative schedule variation (RSV) of task Formula: RSV=(actual time–plan time)/plan time*100% Data Source Org A, Org B Distribution: Normal RSV Data From Org. A (1) Task No. Plan (day) Actual (day) RSV (%) Task No. Plan (day) Actual (day) RSV (%) 1 10 9 -10.0 16 15 18.5 23.3 2 5 3 -40.0 17 5 5.5 10.0 3 10 13.5 35.0 18 5 6.5 30.0 4 8 8 0.0 19 7 6.5 -7.1 5 5 5 0.0 20 7 7.5 7.1 6 12 10.5 -12.5 21 5 5.5 10.0 7 5 5.5 10.0 22 8 8 0.0 8 15 14 -6.7 23 5 4.5 -10.0 9 10 6 -40.0 24 10 13 30.0 10 5 5 0.0 25 5 5 0.0 11 5 5 0.0 26 5 7 40.0 12 20 22 10.0 27 5 5.5 10.0 13 5 5 0.0 28 5 4.5 -10.0 14 5 6.5 30.0 29 10 5 -50.0 15 5 5 0.0 30 5 5 0.0 RSV Data From Org. A (2) Run Chart And Causal analysis μ=1.97% σ=20.97% Task No. RSV (%) Engineer A Engineer B Engineer C 2 -40.0 √ 3 35.0 √ 9 -40.0 √ 14 30.0 √ 16 23.3 √ 18 30.0 √ 24 30.0 √ 26 40.0 √ 29 -50.0 √ RSV Data From Org. A (3) Data After Process Improvement Task No. Plan (day) Actual (day) RSV (%) Task No. Plan (day) Actual (day) RSV (%) 1 5 5 0.0 16 15
您可能关注的文档
- [经济学]城市经济学课件第1章.ppt
- [经济学]第3章 广播电视的栏目化、板块化与节目意识的形成.ppt
- [经济学]第3章会计科目与账户.ppt
- [经济学]第3章 消费者行为理论2.ppt
- [精彩]五粮液包装设计概念提案1228.ppt
- [经济学]第三章 外汇业务与汇率折算.ppt
- [经济学]第7章 个性与旅游行为.ppt
- [经济学]地震勘探原理及资料解释_第1章_地震勘探的理论基础_动力学简介.ppt
- [经济学]第一章 会计总论2011.ppt
- [经济学]第三章 资金的时间价值.ppt
- 人教版九年级英语全一册单元速记•巧练Unit13【速记清单】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit9【速记清单】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit11【速记清单】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit14【单元测试·提升卷】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit8【速记清单】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit4【单元测试·提升卷】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit13【单元测试·基础卷】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit7【速记清单】(原卷版+解析).docx
- 苏教版五年级上册数学分层作业设计 2.2 三角形的面积(附答案).docx
- 人教版九年级英语全一册单元速记•巧练Unit12【单元测试·基础卷】(原卷版+解析).docx
文档评论(0)