- 1、本文档共14页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
毕业论文外文翻译-伦敦2012奥林匹公园滨水景观设计与营造
Riverfront Landscape Design for London 2012 Olympic Park
Client: Olympic Delivery Authority
Location: London, UK
Project Credit: Atkins
Text: Mike McNicholas, Project Director, Atkins
How do you plant along a rivers edge, knowing that millions of people could be passing through thesite in the near future? How do you design, create and maintain the surrounding wetlands, knowing that man-made wet woodland is very rare and transitionalby nature? How do you ensurethat the habitat being created remains viable and sustainable in the long-term? Atkins抏ngineers of the wetlands and river edges on the London 2012 Olympic Park were tasked with fi nding answers to all of these questions.
Covering more than 246 hectares of formerly d erelict industrial land, London抯 new Olympic Park for the London 2012 Olympic and Paralympic Games is one of Europe抯 biggest-ever urban greening projects. Rivers and wetlands are at the heart of the vision for the new park, which lies in east London抯 Lo wer Lee Valley. Th e landscape that抯 now emerging will provide a backdrop for the main action of theLondon 2012 Games.
As river edge and wetland engineers for the project, Atkins has played a critical role in turning the vision into reality. Atkins?remit includes design of the soft river edges and wetlands, including riverbank restoration and bioengineering.
The transformation is unprecedented. More than 8km of riverbanks have been restored as part of the project; in tandem with this, 2 hectares of reed beds and ponds have been created, along with 9,000 square meters of rare wet woodland(Fig.01).
The challenge was about getting people both visual and physical access down to the river-to actually make the rivers more accessible and more open, and therefore the centerpiece of the Park.
Mike Vaughan heads up Atkins multidisciplinary design team, which includes river engineers, geomorphologists and ecologists. 揟he idea was to open up the river corridor by making the stee
您可能关注的文档
- 母语优势翻译策略.doc
- 母语对英语习的影响.doc
- 比较欧洲文学史上的三吝啬鬼形象-毕业论文.docx
- 比较英、汉语广语言的相同性.doc
- 毕业作品阐述《一站幸福》.doc
- 毕业实习及毕业论文设计)工作计划.doc
- 毕业晚会策划书(那年夏天”).docx
- 残疾人无障碍电子小产品设1-毕业设计.docx
- 毕业晚会会设计书.docx
- 毕业答辩程造价有关问题及答案.doc
- 福莱特玻璃集团股份有限公司海外监管公告 - 福莱特玻璃集团股份有限公司2024年度环境、社会及管治报告.pdf
- 广哈通信:2024年度环境、社会及治理(ESG)报告.pdf
- 招商证券股份有限公司招商证券2024年度环境、社会及管治报告.pdf
- 宏信建设发展有限公司2024 可持续发展暨环境、社会及管治(ESG)报告.pdf
- 品创控股有限公司环境、社会及管治报告 2024.pdf
- 中信建投证券股份有限公司2024可持续发展暨环境、社会及管治报告.pdf
- 洛阳栾川钼业集团股份有限公司环境、社会及管治报告.pdf
- 361度国际有限公司二零二四年环境、社会及管治报告.pdf
- 中国神华能源股份有限公司2024年度环境、社会及管治报告.pdf
- 广西能源:2024年环境、社会及治理(ESG)报告.pdf
文档评论(0)