Moduspec钻机初步验收报告L2649.1 PRELIMINARY REPORT.doc

Moduspec钻机初步验收报告L2649.1 PRELIMINARY REPORT.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
陆地钻井队GW192验收初步报告 为中国盘锦长城钻探准备 MODUSPEC INTERNATIONAL (L) LTD 日期 2012.7.19-2012.7.23 建议表 建议如下: 至关重要的建议 基于不恰当的使用或设备的故障会导致一起严重的损伤或环境的破坏。导致生命受到威胁。 主要的建议 基于不恰当的使用或设备的故障,导致设备损坏或钻井作业受到有害的影响。 次要的建议 次要的建议基于一些缺陷,可能导致一个情况,造成一个事故或环境不符合标准需求。 Drawworks Recommendations: 5.1.1.1 Major Install alarm for no water flow and high brake water temperature on drawworks disc brakes 5.1.1.2 Major Ensure to install “Y” strainer in suction side if the brake water cooling pumps. Without strainers the cavity of the disc brakes could be blocked with debris. 5.1.1.3 Major Provide maintenance report for all work carried out on the drawworks during refurbishment. 5.1.1.3 Minor Replace the two pressure gauges on the gearboxes. Disk Brake (Universal) Recommendations: 5.1.2.1.1 Critical Dismantle all brake callipers and service as per manufactures specification. Clean brake disc for all grease and dirt. Verify brake disc is not under size (worn) 5.1.2.1.2 Critical Verify with manufacturer maximum duration of service for the safety callipers. The spring may have to be changed after 6 years in service. Some manufactures recommend 12 monthly change out 5.1.2.1.3 Critical Verify correct pre-charge in the HPU accumulator bottles. 5.1.2.1.4 Major Repair all hydraulic leaks and replace old hydraulic hoses. 5.1.2.1.5 Major Provide maintenance report for the disc brakes Swivel Recommendations: 5.4.1.1 Critical Verify that the threaded connection of the swivel has been inspected for cracks and that the rig has a valid inspection report available. API RP 8B Table 1 5.4.1.2 Critical Verify that the swivel yoke has undergone the required NDT inspection for cracks as per API RP 8B. Valid inspection reports must be on file at the rig site. Travelling Block Recommendations: 5.8.1.1 Critical Install suitable pad eye under the crown block with SWL capable of hanging the travelling block and hook. This is for safety hang off line during slip and cut of drilling line. 5.8.1.2 Major Verify that the high l

文档评论(0)

xingyuxiaxiang + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档