网站大量收购独家精品文档,联系QQ:2885784924

分子筛进出口管道改造(修改)(Modification of import and export pipeline of molecular sieve (modification)).doc

分子筛进出口管道改造(修改)(Modification of import and export pipeline of molecular sieve (modification)).doc

  1. 1、本文档共27页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
分子筛进出口管道改造(修改)(Modification of import and export pipeline of molecular sieve (modification)).doc

分子筛进出口管道改造(修改)(Modification of import and export pipeline of molecular sieve (modification)) This paper contributes to the bunker by the grey DOC documents may experience poor browsing on the WAP side. It is recommended that you select TXT first or download the source file to the local machine. 2 sets of polyoxymethylene steam reasonable use of research and construction program Preparation: preparation: Audit: Approval: approval: Yin hung Baizhanwei October machinery factory workshop Maohan technology group two hours, nine years First pages Catalog One: Construction overview 3 two: compilation basis 4 three: construction organization and schedule 4 four: material inspection 5 five: construction methods and steps 6 six: quality inspection and control 10 seven: pipe pressure test 11 pipeline cleaning, eight: pipe cleaning, purging 12 nine: construction safety and protective measures 12 welding, ten: welding, heat treatment construction scheme 13 Eleven: Eleven: schedule Sixteen Second pages One: construction overview 1.1 the construction background, our company because of its device operation characteristics, the need to convert steam to different pressure levels to meet the needs of production equipment. The 0.45MPa low pressure steam used in the two sets of polyoxymethylene units was decompressed by 3.8MPa medium pressure steam, and there was energy loss during the decompression process. Therefore, it is necessary to make rational use of its steam in order to save costs and improve efficiency. This project is to configure the steam inlet and outlet pipelines of the new turbine unit and the circulating water pipe line of the unit equipment. The main parameters: 1.S38-002-150-D6M01 pipeline pipeline: working medium: superheated steam; design parameters: the temperature of 390 DEG C, the pressure 4.0MPa; operation parameters: the temperature of 365 DEG C (normal) 390 C (max), 3.8MPa (normal pressure) 4.0MPa (highest); strength test medium: water; test pressure: 8.57; p

文档评论(0)

zhangningclb + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档