地下室钢筋绑扎技术交底(Basement reinforcement banding technical explanation ).docVIP

地下室钢筋绑扎技术交底(Basement reinforcement banding technical explanation ).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
地下室钢筋绑扎技术交底(Basement reinforcement banding technical explanation ).doc

地下室钢筋绑扎技术交底37908(Basement reinforcement banding technical explanation 37908) Engineering name Disclosure position Project number Date, Disclosure content: Reinforcement of basement steel bar 1 range The process standard is applicable to the reinforcement of basement reinforced concrete floor and wall. 2 construction preparation 2.1 materials and main equipment: 2.1.1 rebar: should have factory certificate, according to the provisions for mechanical performance re examination. It is necessary to make chemical composition test when the brittle fracture occurs during machining. The steel shall be free of old rust and grease. 2.1.2 wire: use 20~22 wire (burning wire) or galvanized wire (Qian Si). The cutting length of iron wire should meet the requirement of use. 2.1.3 mortar blocks, plastic cards, hooks or struts for concrete protection layer. 2.1.4 tools: steel hook, crowbar, wrench, lashing wire rack, brushes, trolleys, chalk and rulers. 2.2 operation conditions: 2.2.1 according to the location of the construction site plan, the steel stacking site cleaning, leveling. Ready to pad wood, according to steel binding order classification stacking, and rust cleaning. 2.2.2 check the grade, type, shape, size and quantity of steel bars, whether it is the same as the design drawings and processing ingredients list. 2.2.3 when the groundwater level is high in the construction site, drainage and dewatering measures must be taken. 2.2.4 familiar with the drawings, in order to determine the reinforcement with, and do the work in conjunction with the relevant types, such as formwork, pipeline, waterproof construction and assembling reinforcement relationship, construction method, make technical disclosure. 2.2.5 according to the basement waterproof construction scheme (by sticking plaster or construction), floor reinforcement binding finish bottom waterproof layer and a protective layer; a bottom end around the template (or end wall masonry protection, waterproof layer). When the

文档评论(0)

zhangningclb + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档