二00八LEEDCaseStudy个案研究.ppt

  1. 1、本文档共53页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
二00八LEEDCaseStudy个案研究

NC-project Nokia BDA Campus Energy Efficient Design for LEED LEED Assessment Summary (2007-10-19) SS Credit 8: Light Pollution Reduction Intent Minimize light trespass from the building and site, reduce sky-glow to increase night sky access, improve nighttime visibility through glare reduction, and reduce development impact on nocturnal environments. Requirements FOR INTERIOR LIGHTING The angle of maximum candela from each interior luminaire as located in the building shall intersect opaque building interior surfaces and not exit out through the windows. OR All non-emergency interior lighting shall be automatically controlled to turn off during non-business hours. Provide manual override capability for after hours use. SS Credit 8: Light Pollution Reduction AND FOR EXTERIOR LIGHTING Only light areas as required for safety and comfort. Do not exceed 80% of the lighting power densities for exterior areas and 50% for building facades and landscape features as defined in ASHRAE/IESNA Standard 90.1-2004, Exterior Lighting Section, without amendments. EA Prerequisite 1: Fundamental Commissioning of the Building Energy Systems Intent Verify that the building’s energy related systems are installed, calibrated and perform according to the owner’s project requirements, basis of design, and construction documents. Commissioned Systems Commissioning process activities shall be completed for the following energy-related systems, at a minimum: ? Heating, ventilating, air conditioning, and refrigeration (HVACR) systems (mechanical and passive) and associated controls ? Lighting and daylighting controls ? Domestic hot water systems ? Renewable energy systems (wind, solar etc.) EA Prerequisite 2: Minimum Energy Performance Intent Establish the minimum level of energy efficiency for the proposed building and systems. Requirements Design the building project to comply with both— ? the mandatory provisions (Sections 5.4, 6.4, 7.4, 8.4, 9.4 and 10.4) of ASHRAE/IESNA Standard 90.1-2

文档评论(0)

wuyoujun92 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档