- 1、本文档共21页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
PowerSector Reforms New World Nigeria电力行业的改革——新世界尼日利亚
Nigeria Business and Investment Summit, London. July 30, 2012. Investment Opportunities in the Nigerian Power Sector by Prof. Bart Nnaji Honourable Minister of Power The Federal Government of Nigeria has a “Vision 20-2020”: 40,000MW of power by the year 2020 Current installed capacity of 8,425MW is 20% of vision target Available capacity is only about 50% of installed capacity Massive expansion in generation, transmission and distribution infrastructure (US$100b in 10 years) needed Generation alone requires over $3.5billion/year for the next 8 years Government is unable to fund and manage this requirement. Hence, the decision to reform the sector Federal Ministry of Power * Nigeria needs to dramatically increase its power generation to unlock the country’s full economic potential * * * * * * Power generation installed capacity 1 Capacity estimate based on consumption per capita average of Brazil and South Africa and with capacity utilization of 70% To achieve Brazil GDP per capita level by 2030 (i.e., $10,000), we will need 135GW1 of capacity to supply a projected 230m Nigerians This is a 15 times capacity increase from today It also means we need to build power plants at 7 GW/year for the next 18 years. kW / thousand inhabitants * Federal Ministry of Power Monopoly of the Nigerian Power Sector – Single authority National Electric Power Authority (NEPA) was in place up until 2005 Inefficient management of power supply systems High technical and non-technical losses in the power system Corrupt public-owned and public-managed power sector Obsolete and inefficient power infrastructure owing to little or no maintenance Minimal investment in power Low tariff rates with low collection rates Federal Ministry of Power * Federal Ministry of Power * Nigeria had one of the lowest low tariff levels in Sub-Saharan Africa making it uncompetitive for private sector participation. A new cost reflective tariff commenced June 1, 2012 to enable investors reco
您可能关注的文档
- Mt Diablo Unified School Distict机器翻译暗黑学区.ppt
- MSMQ 30 New FeaturesMSQ 30新特点.ppt
- Multicycle conclusion coursecswashingtonedu结论coursescswashingtonedu多旋回.ppt
- Multiliteracies A New Paradigm for Arts Educaionmultiliteracies艺术教育的新范式.doc
- Mrs Dalloway Visual Notes达洛维夫人觉笔记.ppt
- Monitoring will occur overa 60month period Barry A Vittor 监测将发生在60个月内巴里比托尔.doc
- Multilingual Education from Traditiona to eLearning从传统的电子学习语言教育.ppt
- Multifrequency VLBA polarimetry of the Fermidetected quasar 的费多频VLBI偏振探测类星体.ppt
- MultiParadigm Modelsas Source for Automatic Test Construction多范式模型作为自动组卷源.ppt
- MultiplChoice Items多项选择题.ppt
最近下载
- 小学体育_队列队形教学设计学情分析教材分析课后反思.doc
- 中建项目商务策划汇报模板.pptx
- 公路中小跨径钢-混组合梁桥标准图集(制订)》技术方案报告.docx
- “设计思维与方法”教案.ppt
- 大职赛生涯闯关参考答案.docx VIP
- 2022《美宜佳公司营运资金管理存在的问题及对策研究》开题报告文献综述(含提纲)3200字.docx VIP
- 长垣市人民医院西学中培训班《方剂学》考试.pdf VIP
- 苏教版一年级科学上册4.1《自然物与人造物》(课件).pptx
- 电子商务招聘简章模板.pdf
- 统编版小学语文二年级上册第六单元 先辈伟人 大单元整体学历案教案 教学设计附作业设计(基于新课标教学评一致性).docx
文档评论(0)