CDM项目核查和认证CDMProjectVerificationandCertification.ppt

CDM项目核查和认证CDMProjectVerificationandCertification.ppt

  1. 1、本文档共28页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
CDM项目核查和认证CDMProjectVerificationandCertification

CDM项目核查与认证 CDM Project Verification and Certification CDM项目流程:The CDM Project Cycle 核查:Verification 核查是指由指定的经营实体定期独立审评和事后确定已登记的CDM 项目活动在核实期内产生的、经监测的温室气体(GHG)源人为减排量。核实期的期限长短尚没有规定。但是, 核查期不得长于计入期。 Verification is the periodic independent review and ex post determination by a designated operational entity of monitored reductions in anthropogenic emissions by sources of greenhouse gases (GHG) that have occurred as a result of a registered CDM project activity during the verification period. There is no prescribed length of the verification period. It shall, however, not be longer than the crediting period. 初始核查(自愿性):Initial Verification(voluntary) 初始核查的目的是核查项目已按照计划实施、监测系统已有效是运行,确保项目可以产生CERs The objective of an initial verification is to verify that the project is implemented as planned, to confirm that the monitoring system is in place and fully functional, and to assure that the project will generate verifiable emission reductions. 确保项目按照计划已经实施,监测系统有效运行,项目已经具备产生CERs的条件 -to ensure that the project has been implemented as planned, that the monitoring system is in place and that the project is ready to generate and record GHG emission reductions; 评估在项目实际设计与建设中所导致监测系统的变化与调整, -to assess adjustments and amendments to the monitoring plan that may have become necessary during the detailed design and construction of the project (Please note that the CDM and JI modalities do not give guidance on handling changes to previously validated monitoring plans); 为项目产生高质量的CER提供保证 -to provide assurance of generation of high quality emission reductions and clear the way for project commissioning. 文件评审:Desk Review 现场评审:On-Site Assessment (1) 现场评审应能够使核查机构确信项目已经具备产生高质量的CERs的条件。 The on-site assessment shall enable the verifier to arrive at a conclusion regarding the readiness of a project to start with the generation of high quality emission reductions. 现场评审应包括相关的设备是否按照计划已经安装 whether all relevant equipment is installed and works as anticipated. 与地方利害相关方讨论在建设阶段环境与社会影响的达成情况 Discussion

文档评论(0)

haowendangqw + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档