- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
兰州一中2015-2016-I学期高三年级期中考试试题 英 语说明:本试卷分第I卷(选择题)和第II卷(非选择题)两部分,满分120分。考试时间100分钟。答案写在答题卡上,交卷时只交答题卡。第一部分 阅读理解(共两节,满分40分)第一节 (共15小题;每小题2分,满分30分) 阅读下列短文,从每题所给的四个选项(A、B、C和D)中, 选出最佳选项。 A According to the US government, wind farms off the Pacific coast could produce 900 gigawatts of electricity every year. Unfortunately, the water there is far too deep for even the tallest windmills to touch bottom. An experiment under way off the coast of Norway, however, could help put them anywhere. The project, called Hywind, is the world’s first large-scale deepwater wind turbine (涡轮发电机). Although it uses a fairly standard 152-ton, 2. 3-megawatt turbine, Hywind represents totally new technology. The turbine will be fixed 213 feet above the water on a floating spar, a technology Hywind’s creator, the Norwegian company StatoilHydro, has developed recently. The steel spar, which is filled with stones and goes 328 feet below the sea surface, will be tied to the ocean floor by three cables ; these will keep the spar stable and prevent the turbine from moving up and down in the waves. Hywind’s stability in the cold and rough sea would prove that even the deepest corners of the ocean are suitable for wind power. If all goes according to the plan, the turbine will start producing electricity six miles off the coast of southwestern Norway as early as September. To produce electricity on a large scale, a commercial wind farm will have to use bigger turbines than Hywind does, but it’s difficult enough to balance such a large turbine so high on a floating spar in the middle of the ocean. To make that turbine heavier, the whole spar’s center of gravity must be moved much closer to the ocean’s surface. To do that, the company plans to design a new kind of wind turbine, one whose gearbox (变速箱) sits at sea level rather than behind the blades. Hywind is a test run, but the benefits for perfecting floating wind-farm technology could be extremely large
您可能关注的文档
- 4年级下册计算复习总结.doc
- 5月汽机考试汇总.docx
- 【优质】3.2_植物体结构层次.ppt
- 10月13__企业税收与财务风险分析.doc
- 14年上海语文高考试卷解析和点评.doc
- 10-15年北京高考经济生活考试试题汇总.doc
- 303T梁预制首件工程和总结.doc
- 2002年国家公务员 考试行政职业能力测试一真题和答案.doc
- 2004年销售奖励和费用管理办法.doc
- 2014--2015年上学期教学工作计划总结.doc
- 2024年度党员干部民主生活会班子对照检查材料.docx
- 公司党委领导班子2024年度民主生活会对照检查材料4个带头方面.docx
- 市府办(政府办)领导班子2024年民主生活会会后综合情况报告.docx
- 在2025年市司法局信息宣传工作推进会上的讲话.docx
- 在2025年全省文化旅游高质量发展推进会上的讲话.docx
- 在2025年全区工业、住建大规模设备更新推进会上的讲话.docx
- 党支部2024年组织生活会民主评议党员情况总结报告_1.docx
- 2024年度组织生活会个人对照检查剖析材料.docx
- 镇党委书记2024年度民主生活会对照检查材料1.docx
- 党支部2024年组织生活会民主评议党员情况总结报告.docx
最近下载
- 日本日立变频器sj300系列调试参考手册.pdf
- 苏教版三年级下册含有小括号的混合运算教学设计.docx
- 施工安全管理员工培训.pptx VIP
- 禽流感课件(共23张PPT)《动物疫病防治》.pdf VIP
- 在2024年度组织生活会和民主评议党员会上的点评讲话+民主评议党员会议议程.doc VIP
- 天然苏打水标准.pdf VIP
- 理光MPC3004 3504 4504 6004SP维修手册.pdf VIP
- 部编版四年级下册语文5琥珀ppt课件设计 (3).ppt
- 第六节:隋唐统一多民族国家的发展.ppt VIP
- 兴文县2025年第一次公开考调公务员 (参照管理人员)(30人)笔试模拟试题及答案解析.docx
文档评论(0)