国际工程建设合同条件的理解跟运用.pptVIP

国际工程建设合同条件的理解跟运用.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
国际工程建设合同条件的理解跟运用

第一节 国际工程合同中的风险承担 ICE:Adverse physical conditions and artificial obstructions 12 (1) If during the execution of the Works the Contractor shall encounter physical conditions (other than weather conditions or conditions due to weather conditions) or artificial obstructions which conditions or obstructions could not in his opinion reasonably have been foreseen by an experienced contractor the Contractor shall as early as practicable give written notice thereof to the Engineer. 第一节 国际工程合同中的风险承担 ICE:Intention to claim (2) If in addition the Contractor intends to make any claim for additional payment or extension of time arising from such condition or obstruction he shall at the same time or as soon thereafter as may be reasonable inform the Engineer in writing pursuant to Clause 52(4) and or Clause 44(1) as may be appropriate specifying the condition or obstruction to which the claim relates. 第一节 国际工程合同中的风险承担 ICE:Measures being taken (3) When giving notification in accordance with sub-clauses (1) and (2) of this Clause or as soon as practicable thereafter the Contractor shall give details of any anticipated effects of the condition or obstruction, the measures he has taken is taking or is proposing to take their estimated cost and the extent of the anticipated delay in or interference with the execution of the Works. 第一节 国际工程合同中的风险承担 ICE: (5) Conditions reasonably foreseeable If the Engineer shall decide that the physical conditions or artificial obstructions could in whole or in part have been reasonably foreseen by an experienced contractor he shall so inform the Contractor in writing as soon as he shall have reached that decision but the value of any variation previously ordered by him pursuant to sub-clause (4) (d) of this Clause shall be ascertained in accordance with Clause 52 and included in the Contract price. 第一节 国际工程合同中的风险承担 ICE:(6) Delay and extra cost Where an extension of time or additional payment is claimed pursuant to sub-clause ( 2 ) of this Clause th

文档评论(0)

rachel + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档