module4-1rd_reqm(2h)需求开发与需求管理.ppt

  1. 1、本文档共45页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
module4-1rd_reqm(2h)需求开发与需求管理

Obtain understanding(需求理解) 2013-5-16 S115 Inputs 1 Software requirements Steps 1 PM and stakeholders establish acceptance criteria for defining requirements with appropriate requirement’s providers 2 PM and designated personnel review and analyze the requirements, ensuring that the requirements acceptance criteria is met. 3 PM and all stakeholders hold a meeting to reach sufficient understanding on requirements Exit Criteria 1 The stakeholders understand and commit to the requirements. Control changes(变更流程控制) Inputs 1 The new requirement or requirement change request Steps 1 PM defines which products of this process are to be maintained under configuration control. 2 PM and relevant stakeholders evaluate and document impact of the proposed changes against existing commitments, project plans, current requirements, project activities, and other work products 3 PM, relevant stakeholders and high level management review the changes and make their decisions (approve or disapprove) 4 If changes are approved, relevant stakeholders execute the changes for the impacted work products. 5 CM makes requirements and change data available to the project’s relevant stakeholders Outputs 1 Modified SRS Modified related CI items Change request Form Maintain traceability Entry Criteria 1 Requirements have been understood, Design spec has been reviewed, test plan and test case have been reviewed Steps 1 The requirements have been understood and the commitment to requirements has been obtained, PM establishes the requirement traceability matrix form and fills in the function ID and relevant requirement ID 2 Designers fill in the relevant Design spec ID 3 QA manager fills in the relevant test plan and test case ID 4 Developers fill in the relevant code ID 5 PM maintains the Requirement Traceability Matrix Exit Criteria 1 The Requirement Traceability Matrix Form is established and maintained Identify inconsistencies Entry Criteria 1 Requirements are documented and understood or re

文档评论(0)

rachel + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档