- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土木工程外文翻译在不良地质条件下的隧道掘进
西 南 交 通 大 学
本科毕业设计
外文翻译
年 级:
学 号:
姓 名:
专 业:
指导老师:
2012 年 6月TBM TUNNELLING IN DIFFICULT GROUND CONDITION
Giovanni Barla and Sebastiano Pelizza
ABSTRACT
This paper is to discuss TBM tunneling in difficult ground conditions, when problems are met which may reduce dramatically the average progress rates and practical consequences may be such as to pose serious questions on the use of mechanized TBM tunnelling versus drill blast and other so-called traditional excavation methods. Following a few remarks on rock TBM tunnelling in relation to the selection and dimensioning of the machine, the attention is posed on the limiting geological conditions which may be envisaged with respect to the use of TBM tunnelling and on the importance of geological and geotechnical investigations, in order to derive an appropriate understanding of the rock mass conditions along the line of the tunnel. The discussion is centered upon the relatively more important or difficult ground conditions including borability limits, instability of excavation walls, instability of excavation face, fault zones and squeezing. Whenever available to the authors and based on project experience, the point of view is illustrated by case examples, which give the opportunity to underline specific difficulties encountered and recommendations.
INTRODUCTION
TBM excavation represent a big investment in an unflexible but potentially very fast method of excavating and supporting a rock tunnel (Barton, 1996). When unfavorable conditions are encountered without warning, time schedule and practical consequences are often far greater in a TBM driven tunnel than in a drill and blast tunnel.
The unfavorable conditions can be produced by either a rock mass of very poor quality causing instability of the tunnel or a rock mass of very quality (i.e. strong and massive rock mass) determining very low penetration rates. However, it is to be observed that when using the full face mechanized excavation m
您可能关注的文档
- 园林别墅设计方案农村平房别墅设计图纸及效果图.doc
- 园林史及园林艺术原理复习资料(中国古典园林史部分).doc
- 园林工程中的景观设计技术的发展与创新.doc
- 园林工程施工管理论文浅谈园林工程的施工管理.doc
- 园林工程施工组织设计_1.doc
- 园林工程施工论文.doc
- 园林工程论文园林工程假山施工技术探讨.doc
- 园林微地形施工措施建筑工程论文.doc
- 园林景观亭施工方案.doc
- 园林景观施工方案_1.doc
- 第十一章 电流和电路专题特训二 实物图与电路图的互画 教学设计 2024-2025学年鲁科版物理九年级上册.docx
- 人教版七年级上册信息技术6.3加工音频素材 教学设计.docx
- 5.1自然地理环境的整体性 说课教案 (1).docx
- 4.1 夯实法治基础 教学设计-2023-2024学年统编版九年级道德与法治上册.docx
- 3.1 光的色彩 颜色 电子教案 2023-2024学年苏科版为了八年级上学期.docx
- 小学体育与健康 四年级下册健康教育 教案.docx
- 2024-2025学年初中数学九年级下册北京课改版(2024)教学设计合集.docx
- 2024-2025学年初中科学七年级下册浙教版(2024)教学设计合集.docx
- 2024-2025学年小学信息技术(信息科技)六年级下册浙摄影版(2013)教学设计合集.docx
- 2024-2025学年小学美术二年级下册人美版(常锐伦、欧京海)教学设计合集.docx
最近下载
- 江苏省扬州市扬州中学2023-2024学年高一上学期12月月考数学试题(含答案解析).docx
- 2024年国家电网招聘之财务会计类题库附参考答案(轻巧夺冠).docx
- 恶性肿瘤放疗患者营养治疗专家共识解读PPT课件【31页】.pptx VIP
- 江苏省海门市高一上学期期末考试(数学).doc
- PowerVision臻迪无人机PowerEgg用户手册.pdf
- 蓝海华腾变频器说明书.pdf
- 幼儿园小班家访记录表.pdf
- 江苏省扬州市邗江中学2019-2020学年高一上学期期中数学试题(解析版).pdf VIP
- 第一讲数字集成电路质量评价.ppt
- 辽宁省沈阳市浑南区2022-2023学年九年级上学期10月月考物理试题(含答案).pdf VIP
文档评论(0)