- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
超高混凝土面板堆石坝的关键技术问题_毕业论文外文文献翻译
外文文献及翻译
Key technical problems of extra-high
concrete faced rock-fill dam
ABSTRACT
This paper summarizes the main technical points related to 100 m-height-scale concrete faced rock-fill dams and analyzes the main problems and their causes occurring during construction of 200 m-height-scale concrete faced rock-fill dams.This paper has raised the key technical problems which need to study for construction of 300 m-height-scale concrete faced rock-fill dams based on the main experiences on the extra-high concrete faced rock-fill dams built after the year of 2000.
1 Introduction
More and more concrete faced rock-fill dams have been built nowadays at home and abroad thanks to its good adaptability to topographical and geological conditions, rainy and harsh climate, less demanding on goods and materials from outside areas, less amount of construction quantities, faster construction process, safer operation and easier maintenance.
By the end of 2005 more than 150 concrete faced rock-fill dams have been built or under construction in the country, of which 37 have their height over 100 m and 14 have their height over 150 m; 15 concrete faced rock-fill dams are founded on thick overburdens. The Shuibuya concrete faced rock-fill dam, 233 m high, which is to be completed by the end of 2007, will be the highest dam of this kind in the world. At present the 300 m height scale concrete faced rock-fill dams are to be built in the country.
People of the dam engineering circles hold that a concrete faced rock-fill dam with a height of over 150 m is called an extra high concrete faced rock-fill dam. The key technology of an extra high concrete faced rock-fill dam refers to the major technical problems encountered in construction of a concrete faced rock-fill dam with a height of about 200 m on the basis of ripe experiences in both design and construction of 100 m-height-scale concrete faced rock-fill dams.This paper makes an attempt to summarize the key technical points of the 100
您可能关注的文档
最近下载
- DB11T 383-2023 建筑工程施工现场安全资料管理规程.docx
- 2024-2025学年小学劳动三年级上册人教版《劳动教育》教学设计合集.docx
- 单位工伤事故认定公示情况反馈表(样表).doc
- 卫生监督法律法规和政策文件答案-2024年全国疾控系统“大学习”活动.docx VIP
- (心理咨询师习题集《案例分析》.doc VIP
- 《民航危险品运输》教学课件.docx VIP
- 拼多多新商家基础经营能力认证考试题库答案,平台规则+商品设置+客户服务+订单售后.docx
- 推动车辆互联的创新驱动车联网MNO智能物联卡平台解决方案.pptx
- 云平台解决方案酒店管理系统的完美选择.pptx
- GB50084-2017 自动喷水灭火系统设计规范.docx
文档评论(0)