- 22
- 0
- 约2万字
- 约 15页
- 2018-08-24 发布于贵州
- 举报
超高混凝土面板堆石坝的关键技术问题_毕业论文外文文献翻译
外文文献及翻译
Key technical problems of extra-high
concrete faced rock-fill dam
ABSTRACT
This paper summarizes the main technical points related to 100 m-height-scale concrete faced rock-fill dams and analyzes the main problems and their causes occurring during construction of 200 m-height-scale concrete faced rock-fill dams.This paper has raised the key technical problems which need to study for construction of 300 m-height-scale concrete faced rock-fill dams based on the main experiences on the extra-high concrete faced rock-fill dams built after the year of 2000.
1 Introduction
More and more c
您可能关注的文档
最近下载
- 2026年服装设计师考试题库(含答案).docx
- 骨科手术部位感染创面预防与治疗的专家共识(2026 版).docx VIP
- 新视野大学英语(第四版)读写教程1(思政智慧版)外研社编Unit 3Section C+Project.pptx VIP
- TB 10314-2021 邻近铁路营业线施工安全监测技术规程.pdf
- 包装制品有限公司双体系资料之隐患排查治理手册.doc VIP
- 建筑工程施工现场机械伤害事故应急救援预案(全套含演练流程).docx
- 新版民用航空安全检查工作手册.pdf VIP
- 2026年服装设计师专业考试题库及答案解析.docx VIP
- 全回转钻孔灌注桩施工方案.docx VIP
- 装饰装修工程施工现场火灾应急救援预案(全套含演练流程).docx
原创力文档

文档评论(0)