超高混凝土面板堆石坝的关键技术问题_毕业论文外文文献翻译.doc

超高混凝土面板堆石坝的关键技术问题_毕业论文外文文献翻译.doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
超高混凝土面板堆石坝的关键技术问题_毕业论文外文文献翻译

外文文献及翻译 Key technical problems of extra-high concrete faced rock-fill dam ABSTRACT This paper summarizes the main technical points related to 100 m-height-scale concrete faced rock-fill dams and analyzes the main problems and their causes occurring during construction of 200 m-height-scale concrete faced rock-fill dams.This paper has raised the key technical problems which need to study for construction of 300 m-height-scale concrete faced rock-fill dams based on the main experiences on the extra-high concrete faced rock-fill dams built after the year of 2000. 1 Introduction More and more concrete faced rock-fill dams have been built nowadays at home and abroad thanks to its good adaptability to topographical and geological conditions, rainy and harsh climate, less demanding on goods and materials from outside areas, less amount of construction quantities, faster construction process, safer operation and easier maintenance. By the end of 2005 more than 150 concrete faced rock-fill dams have been built or under construction in the country, of which 37 have their height over 100 m and 14 have their height over 150 m; 15 concrete faced rock-fill dams are founded on thick overburdens. The Shuibuya concrete faced rock-fill dam, 233 m high, which is to be completed by the end of 2007, will be the highest dam of this kind in the world. At present the 300 m height scale concrete faced rock-fill dams are to be built in the country. People of the dam engineering circles hold that a concrete faced rock-fill dam with a height of over 150 m is called an extra high concrete faced rock-fill dam. The key technology of an extra high concrete faced rock-fill dam refers to the major technical problems encountered in construction of a concrete faced rock-fill dam with a height of about 200 m on the basis of ripe experiences in both design and construction of 100 m-height-scale concrete faced rock-fill dams.This paper makes an attempt to summarize the key technical points of the 100

文档评论(0)

a888118a + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档