- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
HYPERLINK / / /
HYPERLINK / / /
四方面分析如何做好排水管道工程施工质量管理
摘 要:从施工准备阶段.管道施工阶段.管线安装.检查井施工以及土方回填和闭水试验等方面论述了市政给排水管道工程施工质量管理重点及措施.
Pick to: based on the construction preparation stage, stage of pipeline construction, pipeline installation and construction inspection Wells and earthwork backfill and closed water test and so on discusses the municipal water supply and drainage pipeline engineering construction quality management emphasis and measures.
关键词:市政;给排水;管道
Key words: municipal; Water supply and drainage; pipeline
一. 施工准备阶段质量控制
A preparation phase, construction quality control
(一)道路拆除与恢复? 市政给排水管道施工必然涉及到一定路面地拆除与恢复工作,为了能够保证施工安全及路基质量,在道路开挖前应根据施工图纸计算开口宽度,用白漆标出开挖线之后用切割机将路面切断,用挖掘机对破碎地混凝土路面及碎石等垫层进行开挖并合理堆放以备后用,管路施工完成后地沟槽回填工作直接影响路面地质量及使用功能,尤其是在高原地区更应注重沟槽回填质量,一般对回填土或砂采用夯实或灌水密实,之后采用压路机分层碾压,回填应分层回填及夯实,并应控制每层回填厚度不超过25cm,夯实后采用核子密度仪测量密实度,待其压实率达到95%以上后方可进行下道工序施工.
(a) road demolition and recovery? Municipal water supply and drainage pipeline construction inevitably involves the removal of certain road and back to work, in order to ensure construction safety and quality of roadbed, road excavation shall be computed according to the construction drawings before opening width, marked by white paint after excavation line with cutting machine cutting the pavement, excavator on the broken concrete pavement and gravel cushion layer such as excavation and arrange for later use, after completion of the construction of the pipeline trench backfill work directly affect the quality of the road and use function, more should pay attention to trench backfilling quality especially in plateau area, the general of backfill soil or sand compaction or irrigation is close-grained, after using roller layered crush, backfill should be stratified backfill and compact, and should control each backfill thickness is not more than 25 cm and compactness are measured with nuclear density gauge, after compaction for the compaction rate reaches more than 95% of the rear can construction of
您可能关注的文档
最近下载
- 营养风险筛查NRS2002.doc VIP
- 《马克思主义基本原理》教案 第2课 世界观与哲学的基本问题、物质与意识.pdf VIP
- 普惠托育服务的服务质量和评价.pptx VIP
- 实验十一活髓切断术.ppt VIP
- 安徽财经大学“一流专业”“一流课程”项目建设任务书.pdf VIP
- 良性前列腺增生诊断治疗指南(中国泌尿外科和男科疾病诊断治疗指南2022版).pdf VIP
- 产品溯源管理制度(商检制度之五).doc VIP
- 企业主体责任十二项安全制度.docx VIP
- 安徽省池州市2024-2025学年九年级物理期末复习卷(三)(沪粤版).pdf VIP
- HJ 377-2019 化学需氧量(CODCr)水质在线自动监测仪技术要求及检测方法.docx VIP
文档评论(0)