- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
电力英语9
Unit 9 Distance Protection
A Distance Relay Applications for Tapped and Multiterminal Lines
A typical line of this type is shown in Fig.2.1. The tap at T may be a transformer at or near the line, so that would be the impedance from the tap plus the transformer bank impedance. Sometimes the tap ties through to a bus, as shown in the figure. The tap may serve a load, so that negligible fault current is supplied through it to line faults, or it may tie into a fault source at R, as shown dotted. Another variation is illustrated in Fig. 2.2.
The fundamentals for setting distance relays on these types of lines for primary phase fault protection are as follows:
Set zone 1 for k times the lowest actual impedance to any remote terminal for Fig. 2.1-type circuits, or for k times the lowest apparent impedance to any remote terminal for the special case of Fig. 2.2. k is less than 1, normal 0.9.
Set zone 2 for a value greater than the largest impedance, actual or apparent, to the remote terminals.
The zone 2 timer (T2) must be set so as not to cause misoperation when any terminal is out of service to cause the distance unit to overreach.
Fig. 2.1 Typical tapped or multiterminal line
For some arrangements of circuits, these requirements can make primary protection quite difficult and/or limited. In Fig. 2.1, consider that tap T is very near bus G, so is small and large with very small. Then zone 1 at breaker 1, bus G must be set at 90% of , which is a very small value compared with . Thus high-speed coverage of the line is almost negligible.
On the other hand, If the tap is a load transformer where is high relative to , zone 1 at breakers 1 and 2 can be set for 90% of the line to provide good high-speed line protection.
If R is a load tap in Fig. 2.1, with negligible current to line faults, distance relays (and overcurrent) are not applicable at breaker 3, and basically not necessary, as opening breakers 1 and 2 terminates the line fault. The worst case is a small ge
您可能关注的文档
- 电力市场综述.pdf
- 电力事故例子解析.ppt
- 电力收费营业厅视频监控系统.doc
- 电力隧道专项安全计划.doc
- 电力调度数据网络详细设计跟实施计划v18.doc
- 电力拖动跟电路解析.ppt
- 电力拖动跟运动控制第一节.ppt
- 电力拖动教本.doc
- 电力拖动教育大纲.doc
- 电力拖动控制第2节.ppt
- 2025年广西中考地理二轮复习:专题四+人地协调观+课件.pptx
- 2025年广西中考地理二轮复习:专题三+综合思维+课件.pptx
- 2025年中考地理一轮教材梳理:第4讲+天气与气候.pptx
- 第5讲+世界的居民课件+2025年中考地理一轮教材梳理(商务星球版).pptx
- 冀教版一年级上册数学精品教学课件 第1单元 熟悉的数与加减法 1.1.6 认识1-9 第6课时 合与分.ppt
- 2025年中考一轮道德与法治复习课件:坚持宪法至上.pptx
- 2025年河北省中考一轮道德与法治复习课件:崇尚法治精神.pptx
- 八年级下册第二单元+理解权利义务+课件-2025年吉林省中考道德与法治一轮复习.pptx
- 精品解析:湖南省娄底市2019-2020学年八年级(上)期中考试物理试题(原卷版).doc
- 2025年中考地理一轮教材梳理:第10讲+中国的疆域与人口.pptx
最近下载
- ZZ027 全国职业院校技能大赛(中职组) 婴幼儿保育赛项理论题第3套(含答案).doc VIP
- 单片机(李朝青)课后习题答案.pdf
- ZZ027-全国职业院校技能大赛(中职组)-婴幼儿保育赛项第5套(含答案).doc VIP
- 厦门房地产行业报告.pptx VIP
- 普外科手术并发症处理ppt.pptx
- 劳淋(再发性尿路感染)中医临床路径.doc VIP
- 年处理10万吨乙醇-水筛板精馏塔设计说明书2024.12.18.docx
- 2023年2022版数学课程标准复习题.pdf VIP
- 土地利用现状调查方法技术.pdf
- 2022年人教版中考生物复习知识点思维导图 主题五 动物的运动和行为.ppt VIP
文档评论(0)