青岛地区水泥市场研究报告课件.pptVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
青岛地区水泥市场研究报告课件

Rinker’s Qingdao EBIT increased significantly in the past three years, with most of the increase came from regional overhead reductions and plant cost savings regional overheads decreased by 20% per year from 2004 through 2006 Pumping EBIT increased in 2005 due to cost reduction, however, the significantly declined pumping volume in 2006 brought the pumping EBIT back to a low level However, transport costs experienced an increase, which driving higher the total operational cost Concrete cost remained relatively stable Note: * YEM 2004 is from July 2003 to March 2004, YEM 2005 is from April 2004 to March 2005, while YTD 2006 is from from April 2005 to December 2005 ** Other adjustments include regional overhead, G/L on disposal of assets and bad debts provision. Regional overhead accounts for the most majority of this category Source: Rinker Rinker Qingdao’s earnings have seen steady increases over the past three years Rinker Margin Analysis (2004-06*) RMB/m3 QINGDAO – SUPPLY ANALYSIS – INDUSTRY PROFITABILITY CAGR% (2004-06) 133.0 (20.2) (8.3) 8.2 0.8 EBIT Total Other Adjustments Plant Costs Transport Cost Concrete Cost Volume K m3 133.0 275.4 284.0 Despite well-established credit terms, substantial outstanding payments are still common in the industry Contractors generally give similar credit terms in Qingdao concrete suppliers generally begin to receive payment when the foundation is laid, or when several storeys have been built before the main structure is completed, concrete suppliers usually have received 60-70% of the full concrete price owed concrete suppliers usually receive 80-90% of the total payment when the project is finished “… Payment to concrete suppliers is divided into different phases. In general we pay them 60%, on a monthly basis, before the main structure is finished. When the project is finished, we will pay around 85% of the total. Of course, payment might be delayed as we may not have been paid ourselves …” Project Manager, Jiaozhou

文档评论(0)

sanshengyuan + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档