- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
英文文献
Substation system over-voltage protection technology
Second substation equipment over-voltage protection on electronic information system for the protection of core equipment for the construction of a protected both pressure and other potential system, and through all levels of over-voltage surge protectors of the current step by step into the land of China, Substation secondary safety equipment and reliable operation.
1 second over-voltage substation protection
?In recent years, the substation communications, communications systems, protection systems, background management module frequent over-voltage damage, the main reason for this is weak and its related systems products over-voltage protection level is weak, or no guard against over-voltage Technical measures, the consequences for the safe operation of power grids bring about a greater negative impact. With integrated automation systems and automation systems such as communication systems in the substation weak secondary by the wider use of such electronic systems (equipment) components of the integrated more and more, the growing volume of information storage, speed and accuracy of the Increased and operates only a few volts, current information only microamp level, thus extremely sensitive to outside interference, especially the lightning and electromagnetic pulse, such as over-voltage tolerance is low. When thunder and lightning, such as over-voltage and accompanied by the electromagnetic fields reach a certain threshold, ranging from system failure caused, resulted in heavy equipment or permanent damage to its components. Despite the thunder and lightning viewpoint of electronic systems (equipment) is unlikely, but lightning strike near the land, buildings, communication and air supply line directly Leiyun discharge form, or because of electrostatic induction and the impact of electromagnetic induction formation of over-voltage, There might be connected to the power lines, signal lines or groundin
您可能关注的文档
- 玫瑰与卷心菜作文写作指导.doc
- 环境法平时作业参考 答案及评讲.doc
- 环境水力学ch21.ppt
- 环境影响评价报告公示江西新余佰联万家电子商务仓储配送中心建设环评报告.doc
- 环境影响评价报告公示华湘商贸物流配送中心建设作者来源点击率发布时间字体小大环评报告.doc
- 现代成矿理论进展 2.ppt
- 现代学徒制教学实践管理办法实践流程指导及相关附件.doc
- 现代企业管理 于卫东主编 第2章 经营决策与经营计划.ppt
- 环境水力学M2.ppt
- 现代足球的起源蹴鞠.doc
- 第12课 大一统王朝的巩固 课件(20张ppt).pptx
- 第17课 君主立宪制的英国 课件.pptx
- 第6课 戊戌变法 课件(22张ppt).pptx
- 第三章 物态变化 第2节_熔化和凝固_课件 (共46张ppt) 人教版(2024) 八年级上册.pptx
- 第三章 物态变化 第5节_跨学科实践:探索厨房中的物态变化问题_课件 (共28张ppt) 人教版(2024) 八年级上册.pptx
- 2025年山东省中考英语一轮复习外研版九年级上册.教材核心考点精讲精练(61页,含答案).docx
- 2025年山东省中考英语一轮复习(鲁教版)教材核心讲练六年级上册(24页,含答案).docx
- 第12课近代战争与西方文化的扩张 课件(共48张ppt)1.pptx
- 第11课 西汉建立和“文景之治” 课件(共17张ppt)1.pptx
- 唱歌 跳绳课件(共15张ppt内嵌音频)人音版(简谱)(2024)音乐一年级上册第三单元 快乐的一天1.pptx
最近下载
- 萝卜回来了:小班语言课(课堂PPT).pptx
- 钢结构厂房施工方案技术标.pdf VIP
- 2024八年级英语下册 Unit 9 Have you ever been to a museum说课稿(新版)人教新目标版.docx
- 太峪隧道斜井交叉口挤压变形段涌水处理技术.pdf VIP
- 《儿童腺样体肥大中医诊疗指南》.pdf VIP
- 钢结构厂房冬季施工方案.docx VIP
- 麦积山隧道2#斜井涌水处理及反坡排水方案浅谈.pdf VIP
- 狼和鸭子儿童故事PPT课件.ppt VIP
- 国际版抖音TikTok短视频直播电商培训教程(一)Tiktok下载与注册.pptx
- 战争与和平——美术作品反映战争 课件-2023-2024学年高中美术湘美版(2019)美术鉴赏.pptx VIP
文档评论(0)