工程管理毕业设计外文翻译--层次概率成本分析模型纳入MAIMS原则EPC工程总承包项目的成本估算(适用于外文翻译+中英文对照)(毕业学术论文设计).docVIP

  • 8
  • 0
  • 约2.47万字
  • 约 16页
  • 2018-09-26 发布于广西
  • 举报

工程管理毕业设计外文翻译--层次概率成本分析模型纳入MAIMS原则EPC工程总承包项目的成本估算(适用于外文翻译+中英文对照)(毕业学术论文设计).doc

w Hierarchy probability cost analysis model incorporate MAIMS principle for EPC project cost estimation 4. Hierarchy integrated probability cost analysis (HIPCA) models for EPC cost estimation. In this section we introduce hierarchy probability cost analysis (HIPCA) methodology, which incorporates all aforementioned concepts for determining the total project cost (TPC) of EPC projects. Our objective is to develop an optimal but realistic TPC for a given probability of success (PoS) that we assume has been specified by allocating the baseline budgets, and managing contingency, based on the de

文档评论(0)

1亿VIP精品文档

相关文档