- 13
- 0
- 约3.81万字
- 约 26页
- 2018-11-12 发布于广西
- 举报
w
the stage of the project cost management
Abstract:Project cost management is the basic contents to determine reasonable and effective control of the project cost. Described the current stage of the project cost management situation on the strengthening of the various stages of construction cost management of the importance of and raised a number of key initiatives.
Keywords:project cost;the current stage of the project;project cost management;
Even under the WTO and Chinas accession to the world community, Chinas construction industry how to effectively control construction cost of the construction and management of an important component part. However, the current budget for the construction projects - estimate, budget, Super budget accounts for the super three is still widespread and that eventually led to a serious loss of control of project investment. Project cost management is the basic contents to determine reasonable and effective control of the project cost.
As the project cost to the project runs through the entire process, stage by stage can be divided into Investment Decision stage, the design and implementation phases. The so-called Project Cost effective control is the optimization of the construction plans and design programs on the basis of in the building process at all stages, use of certain methods and measures to reduce the cost of the projects have a reasonable control on the scope and cost of the approved limits.
Engineering and cost management work of the current status of project cost management system was formed in the 1950s, 1980s perfect together. Performance of the country and directly involved in the management of economic activities. Provisions in the design stage to different estimates or budget preparation as well as government; Nothing relevant departments to formulate a budget, content, methods and approval, the budget will provide the fixed cost of equipment and materials and fixed price of the budget preparation, approval,
您可能关注的文档
- 毕业论文-房地产企业公司的VI设计.doc
- 毕业论文-废油脂中皂化值的测定.doc
- 毕业论文-分类讨论思想在解题中的运用论文.doc
- 毕业论文-分类讨论在中学数学中的应用.doc
- 毕业论文-分析审计风险的防范与控制--以YLDQ公司为例.doc
- 毕业论文-分析我国发展绿色会计存在的问题与实施建议.docx
- 毕业论文-分油机跑油故障排除.doc
- 毕业论文-分子综合性实验论文--Pfu酶的表达,纯化及功能分析-(精).doc
- 毕业论文-粉煤灰掺量对水泥性能的影响.doc
- 毕业论文-风化蚀变围岩隧道设计与施工.doc
- 毕业论文-工程管理专业外文翻译(中英文对照)(适用于外文翻译+中英文对照).doc
- 毕业论文-工程经济学概论论文--基于生产多样化规模经分析-(精).doc
- 毕业论文-工程机械液压系统故障诊断方法与实践.doc
- 毕业论文-工程项目投资控制研究.doc
- 毕业论文-工程项目分包合同纠纷风险的规避和对策探讨.doc
- 毕业论文-工程机械柴油机燃油系供油特性曲线的研究.doc
- 毕业论文-工商管理专业外文翻译--西方企业员工福利满意度研究述评(适用于外文翻译+中英文对照).doc
- 毕业论文-工业设计专业外文翻译--德国包豪斯设计与未来设计趋势(适用于外文翻译+中英文对照).doc
- 毕业论文-工业机器人球坐标型机械臂结构设计.doc
- 毕业论文-公路绿化带噪音衰减效应及其模式优化.doc
最近下载
- 矿业商业计划书.docx VIP
- 盐城市亭湖区2023-2024学年九年级上学期期末化学压轴卷(含答案).doc VIP
- 交通运输部直属事业单位统一招聘笔试真题2023.docx VIP
- GB50021-2001(2009年版)岩土工程勘察规范.pdf VIP
- 2000-2024年AMC8真题含答案(共24套).pdf VIP
- 桂林烟草公司应聘人员登记表.DOC VIP
- AT500系列高性能矢量型变频器说明书V1.03.pdf VIP
- 超临界流体发泡鞋材全球市场研究TOP厂商排名及行业化总体规模预测.pdf VIP
- 2026人教版小学六年级上册数学期末考试3套试卷(打印版含答案解析).docx
- 【电梯维保】投标模板(范本).docx VIP
原创力文档

文档评论(0)