PP模块经典教材SAP培训教材.ppt

* * * * * * * * * * * * * * The customer 需求 consumes the 计划 in非独立需求uirement 数量 that lies either directly before it or directly after it. If the 计划 in非独立需求uirement 数量 that lies directly before the customer 需求s does not cover the customer’s 需求, then the system looks for the next closest 计划 in非独立需求uirements either in the future or the past. During this process, the system refers to the consumption periods maintained in the material master or in Customizing for Demand Management (see above). The consumption periods determine the intervals (for backward or forward consumption) within which customer

文档评论(0)

1亿VIP精品文档

相关文档