《航运枢纽冲沙过程非恒定流运动的模型观测及数值模型初》.pptVIP

《航运枢纽冲沙过程非恒定流运动的模型观测及数值模型初》.ppt

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Experimental Studies on Sediment Flushing in the Upstream Approaching Channel of TGP Wang Ruiyu Main Contents Introduction Model Experiment Analysis of the Result Conclusion This study focus on three points: 1. How high is the maximum flushing discharge under the conditions that the difference of the water levels on the two sides of the protecting dike does not exceed 2m. Main Contents Introduction Model Experiment Analysis of the Result Conclusion Water level, water velocity and deposition volume are to be measured during the experiment. Because the process is unsteady, the water level varies much with the time. An automatic measuring device was applied to precisely trace the change of water level. 7 sensors measure the water pressure, and then convert the pressure into water level. The framework of the automatic measuring device Main Contents Introduction Model Experiment Analysis of the Result Conclusion Analysis of the Result of the Experiment 1.Flushing Discharge We have mentioned above that the maximum flushing discharge under the precondition that the difference of the water levels on the two sides of the protecting dike does not exceed 2 meters has to be studied. The water level of the Three Gorges Reservoir during the flood season is 145 meter. This relative low water depth could increase the flushing velocity and thus improve the flushing efficiency. Therefore we will first study the condition of 145m reservoir water level, and the sediment deposition reaches 139m-140m. Analysis of the Result of the Experiment 2. Flushing efficiency Analysis of the Result of the Experiment 3. Fluctuation in the upstream approaching channel To safeguard the navigation, the water flow condition in the upstream approaching channel should satisfy the following requirements: the longitudinal flow velocity2m/s, transverse flow velocity0.5m/s, wave height0.5m, converse flow velocity0.4m/s.Otherwise the safety of the n

文档评论(0)

沙卡娜 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档