网站大量收购闲置独家精品文档,联系QQ:2885784924

IC代工生产管理培训教学讲义.ppt

  1. 1、本文档共57页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
IC代工生产管理培训教学讲义.ppt

Equipment UP Time (2) Sample Calculations Scenario 1: In February 2000, Run Time = 700 hours, Lost Time = 100 hours, Test Time = 100 hours, and Backup Time = 50 hours for WCVD equipment. Scenario 1 WCVD Available Time: In February 2000, Avail Time = 950 hours Lost Rate = 100 / 950 = 10.5% Wafer Per Hour (WPH) (1) Definition Number of wafers processed per hour. Method of Calculation WPH = Wafer Move / Run Time Purpose of Wafer Per Hour (WPH) Index (1) From the present equipment WPH we can determine whether the current equipment rate of production total is normal. The equipment WPH can be used to derive the equipment capacity, which can be in turn used to determine if the total capacity for a particular capability is sufficient. Wafer Per Hour (WPH) (2) Purpose of Wafer Per Hour (WPH) Index (2) The ratio of the current equipment WPH to the Theoretical – WPH (T – WPH) can be used to determine if the equipment is presently operating in the optimum conditions. WPH index can also be used to measure individual MA or shift performance, especially so in manual operations. Relative WPH between equipment running the same recipe can be used to determine the individual equipment Sample Calculations (1) Scenario 1: On 1st of February 2000, Run Time = 20 hours and Wafer Moves = 1700 wafers for WCVD equipment. Scenario 2: The same equipment for the month of February 2000, Run Time = 600 hours and the total Wafer Moves = 54,000 wafers. Scenario 3: Run Time = 12 hours, Wafer Moves by Operator A = 500 and Operator B = 400 on the same equipment. Sample Calculations (2) Scenario 1 WCVD WPH: On 1st of February 2000, WPH = 1,700 / 20 = 85 wafers / hour Scenario 2 WCVD WPH: In the month of February 2000, WPH = 54,000 / 600 = 90 wafers / hour Therefore, we can say that the current equipment rate of production is lower than the average for the whole month. Scenario 3: Operator A has a WPH = 500 / 12 = 41.67 wafe

文档评论(0)

yuzongxu123 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档