大跨度悬索桥锚碇设计与施工-研究.pdfVIP

  • 24
  • 0
  • 约5.85万字
  • 约 45页
  • 2018-11-20 发布于江苏
  • 举报
on shouldnot thanthe of thefoundation stress force,verticalevery great point ina thateach oftheanchorshouldwork stress.Inaddition part good permissible stresscondition.Theanchorstructuralshouldhassufficientof degreesafety. Constructionandits controlarealsodiscussedinthe temperature thesis.The concrete fissure to heatisthe that temperatureowinghydrate question engineers tosolve.Thethesisalsomakeitsown the try anchor always conclusion小Optimize concreteinblocks and divided a structure,depositing layers reasonably.b)decide evaluationof structuralmaterial proper lengthservice,optimize andcutdowncement to volume the heat decrease concretewith hydrateC)adopt minute up expansion,set metalextension intermittent network.d)arrangeappropriateperiod,control working outrelevant controlmeasuretoavoid period.e)carrytemperature concretefissure. Thethesisis to referencetothesamekind and expectingprovide bridge

文档评论(0)

1亿VIP精品文档

相关文档