- 1、本文档共85页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大坡度小半径重叠盾构隧道修建技术研究-土木与建筑工程专业论文
-II-
-II-
THE CONSTRUCTION TECHNOLOGY OF OVERLAPPING SHIELD TUNNEL WITH LARGE SLOPE AND SMALL RADIUS
ABSTRACT
With the continued construction of urban subway, metro shield tunnel encountered a number of close-construction problem. In the condition of a variety of different types of underground structures, pile, abutment, and the distribution of underground pipelines and other complex conditions, how to ensure that its safe construction of the tunnel and Geo-environmental security after construction has brought great difficulties to the design and construction, which leads to the focus of the relevant scientific research institutes, design departments and construction units.
This paper discusses the problem about Guangzhou rail transit line on the 5th District, Village Station to Station Shield Yangqi range of projects in the area Zhuang Station to Zoo Station and the Zoo Station to Station 2 Yangqi shield interval occurred in the upper and lower close overlap range of design and construction of the tunnel shield technology.
Paper first introduces the project location, scope and focus of this project and the difficulties, and proposes a corresponding strategy for these difficulties. Based on the analysis of construction projects at home and abroad similar to the proximity of construction experience, the numerical procedure is conducted by the application of FLAC3D software to stimulate shield small radius curve section of the construction process, which helps to determine the After first under on excavation method for this project. Monitoring measurement is one of the key process for the tunnel construction, which is important to keep abreast of the environmental impact information, timely analysis of feedback, timely adjustment of the design and construction program that will guide on-site construction. Paper focused on analyzing the small radius curve segment on-site monitoring program development, monitoring project implementation and monitoring of data processing
您可能关注的文档
- 大位移水平井段旋转稳斜钻井系统的研究-机械电子工程专业论文.docx
- 大体积承台水化热对结构的影响分析-建筑与土木工程专业论文.docx
- 大位阻IPr配体在磁性聚合物微球上的负载过程及其对Suzuki反应的催化-材料加工工程专业论文.docx
- 大体积混凝土刚度变化时温度应力及配筋分析-结构工程专业论文.docx
- 大体积混凝土施工技术及其应用-建筑与土木工程专业论文.docx
- 大体积混凝土施工过程中的水化热分析及裂纹控制-水利水电工程专业论文.docx
- 大体积混凝土温度应力有限元分析-结构工程专业论文.docx
- 大体积混凝土温度裂缝分析与工程应用-建筑与土木工程专业论文.docx
- 大体积混凝土温度应力问题研究分析-水利水电工程专业论文.docx
- 大体积混凝土筏板温度裂缝控制的分析-建筑与土木工程专业论文.docx
最近下载
- Odrive使用和开发技术资料-Odrive3.6-56V原理图.pdf
- 《伊川县志》(1986~2021)出版发行.docx
- 《新媒体文案写作(微课版)》全套教学课件.pptx
- 护理诊断及护理措施128条护理诊断护理措施 .pdf VIP
- 《生产经营单位应急能力评估规范》.pdf
- 临床微生物学检验理论课:16放线菌属、诺卡菌属、分枝杆菌属检验.pptx
- 医用粘胶相关皮肤损伤MARSI-★.pptx VIP
- 大学毕设论文__汽车雨刮器的设计与动力学分析.doc
- 2023年ABBVD4真空断路器安装手册配CL操动机构及EP固封极柱.pdf
- 3.2.2 共价晶体 (课件)高二化学(人教版2019选择性必修2).pptx
文档评论(0)