- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高层建筑桩筏基础沉降后浇带浇筑时机研究-岩土工程专业论文
Abst
Abstract
万方数据
万方数据
Abstract
In the construction of high-rise building, setting post-pouring strips is the effective method to solve the differential settlement between the main building and podium. Usually the construction of the main building is at the first, so that the primary consolidation settlement can be completed fully. And then the construction of skirt building. Finally, only when the settlement is stable, can be cast the post-pouring strips. Before the post-cast strip being cast, dewatering of foundation pit cannot stop, foundation cannot backfill, the main equipment in buildings cannot be advanced to the installation height. This not only caused the construction cost increasing, but also HYPERLINK res:////XDict.exe/word.html brought great hidden trouble to the safety of foundation pit.
Through the foundation settlement theory algorithm and computer simulation software of pile raft foundation and raft foundation settlement under the natural stress-time-settlement law of development, we will explorate pouring time of post-pouring strips.
( 1 ) Combining geological conditions and working conditions of sample
projects, and create three-dimensional solid model by numerical simulation method, considering the raft, multi-pile and groundwater and other factors. Then summarizing the law of development of Piled Raft foundation settlement
(2)Analyzing the results of numerical simulation and monitoring data to
establish the main - the difference between the podium settlement development curve model;
(3)Setting up the internal force analysis model as the basis of the floor caused
by uneven settlement, according to the reinforced concrete structure crack control requirements, determine the main - the difference between the podium column allows settlement formula; combining with main building and podium differential settlement curve, determine the pouring timing of the post cast strip for settlement controlling;
(4)Proposing the general process of
您可能关注的文档
- 高可用集群作业管理系统的研究与实现-计算机技术专业论文.docx
- 高可用集群系统关键技术的研究与实现-计算机科学与技术专业论文.docx
- 高可移植性x86模拟器的指令翻译和系统态实现框架-计算机软件与理论专业论文.docx
- 高可靠厚膜功率组件低空洞烧结设计与工艺技术研究-电子与通信工程专业论文.docx
- 高可靠千兆以太网交换机研究-通信与信息系统专业论文.docx
- 高可靠处理器体系结构研究-计算机系统结构专业论文.docx
- 高可靠性供电区域规划建设分析-电气工程专业论文.docx
- 高可靠性变时段区域电网无功优化技术研究-模式识别与智能系统专业论文.docx
- 高可靠性工程车辆总线系统实时调度及用户体验研究-控制理论与控制工程专业论文.docx
- 高可靠性电路结构设计与应用-电路与系统专业论文.docx
- 高层建筑桩筏基础共同工作原位测试及理论分析-结构工程专业论文.docx
- 高层建筑桩筏基础工作性状研究及变刚度调平设计-岩土工程专业论文.docx
- 高层建筑梁式转换层结构设计分析和应用-建筑与土木工程专业论文.docx
- 高层建筑梁式转换层抗震性能分析-结构工程专业论文.docx
- 高层建筑楼梯间及前室烟气控制方式的数值模拟研究-供热、供燃气、通风及空调工程专业论文.docx
- 高层建筑消防供电照明防火设计与研究-控制理论与控制工程专业论文.docx
- 高层建筑消防设计与外墙材料选择-建筑与土木工程专业论文.docx
- 高层建筑深基坑安全监控系统的设计与实现-软件工程专业论文.docx
- 高层建筑沉降观测数据管理系统开发分析-地图制图学与地理信息工程专业论文.docx
- 高层建筑深基坑边坡稳定的应力~应变分析-岩土工程专业论文.docx
文档评论(0)