- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
编 号:
审定成绩:
大学
毕业设计(论文)
设计(论文)题目:
学院: 学 生 姓 名 : 专 业 : 班 级 : 学 号 : 指 导 教 师 : 答辩组 负责人 :
填表时间:年月
大学教务处制
摘 要
工厂供电系统是将电能降压再分配电能到各个厂房或车间中去,它由工厂降压变电所,高压配电线路,车间变电所,低压配电线路用电设备组成。工厂总降压变电所及配电系统设计,是根据各个车间的负荷数量和性质,生产工艺对负荷的要求,以及负荷布局,结合国家供电情况,解决对各个部门的安全可靠,经济技术的分配问题。本厂是由10kV的电缆进线,通过母线馈送到变电所的系统。其基本内容有以下几个方面:变电所及全厂的负荷计算,无功功率补偿,短路电流计算和接线图设计,电气设备的选择,母线以及馈线的选择及校验等。【关键词】 无功功率补偿 短路电流
ABSTRACT
Factory power supplies are gained from the power system of power a reasonable amount of propagation, and assign it to the factory of electrical devices. With the development of society, factories on electric energy quality, economy and reliability requirements are also getting higher and higher. Factory power supply design is perfect not only affects the safety production of the factory, also reflected in the factory on the reliability of electricity supply, it and the economic efficiency of enterprises, safe operation of the equipment and personal safety are closely related. Power system of the factory is to step down power and then to distribute the power to the factories and workshops. It consists of total step-down substation, high voltage distribution lines, substation of workplace, low-voltage distribution lines, measure of protection and power devices. The total step-down substation plant and design of distribution system, which is to resolve the security and the distribution of economic and technological problems, is based on the number and nature of each workshop, the production process on the load requirements, and as well as, the load distribution. The factory is a system, with entrance cables of 10kv, distributing the electricity to substations through bus and high voltage switchgear. Its basic content has the following areas: factory incoming line voltage, and plant-load calculation in substation, reactive power compensation and calculation of short ci
您可能关注的文档
最近下载
- 2025年园林公务员测试题及答案.doc VIP
- 华医网不孕症的中西医药诊治新进展相关试题及答案.doc VIP
- CUDA并行编程从入门到实战指南.docx VIP
- 2025超越健康:重构零售药房的社会价值.pdf VIP
- 机械设备施工专项方案.docx VIP
- 张爱玲经典散文(精选11篇).docx VIP
- 1 审计工作底稿编制指引——货币资金.pdf VIP
- 《铁路调度指挥及控制系统》课件——CTC系统概述.pptx VIP
- 高中思想政治必修第1册 中国特色社会主义 第3课 只有中国特色社会主义才能发展中国【复习课件】.ppt VIP
- 信息技术(基础模块)(WPS Office)(AI协同)(微课版)课件 模块七 WPS AI应用.pptx
原创力文档


文档评论(0)