- 11
- 0
- 约1.18万字
- 约 88页
- 2019-01-04 发布于湖北
- 举报
* * The polymer emulsion, at 175°F, is sprayed on the road surface. Weve supplied Stylink CRS-2P for the process; anionic emulsions can also be used. The hot mix is placed immediately (within 3 seconds) after the emulsion. Laydown temp = 280-315°F. May use Stylink in HMA for extra durability on high volume highly stressed applications Paver is specific to system, but hot mix is made using conventional plant. Pavers made under license from the patent holder. Paver includes emulsion storage tank, emulsion spray bar and necessary pumps and electronics for accurate continuous application of
您可能关注的文档
最近下载
- 2025年阿克苏地区温宿县某国企外包岗位招聘10人笔试备考题库及参考答案详解1套.docx VIP
- 10万吨年己二腈工艺设计.docx
- 孟子天时地利人和原文.pptx VIP
- 华侨大学《电路分析基础》2025-2026学年期末试卷.docx VIP
- 爱登堡电梯EDVF30M电气敷线图(V8.4).pdf VIP
- 华硕b8 5bios设置图解教程.pdf VIP
- 财务会计常用Excel表格模板大全-EXCEL中如何实现按多条件汇总统计(会计实例,两种方法,多函数应用技巧).pdf VIP
- 暨南大学博士后人才创新发展改革办法试行.doc VIP
- 53天天练小学语文六年级下测评卷古诗词诵读达标练习时间80分.pdf VIP
- 燕窝直播销售话术.pptx VIP
原创力文档

文档评论(0)