Halliburton Single Trip Multi-Zone(防砂完井技术).pptVIP

  • 88
  • 0
  • 约4.56万字
  • 约 63页
  • 2019-01-08 发布于未知
  • 举报

Halliburton Single Trip Multi-Zone(防砂完井技术).ppt

* This Halliburton Multi-Acting, Reverse, Swivel Ball Check Assembly provides a means to monitor screen annulus pressure when in the weight down position with a weight down collet section below. To stop losses the service tool is raised, the upper section of the tool pulls the ball on seat. To re-establish communication, weight is set down to push the ball back off seat. This multi-acting, reverse, swivel ball check assembly is run with the ported sleeve down (wash pipe weight hanging). * The Halliburton MKP Lug-Type Self-Releasing Positioning Tool is a positioning tool installed below a Halliburton Multi-Position Tool (MPT). It is used to open or close sleeve-shifting devices. It uses 90° shoulders to positively engage the inner sleeve of a mating sleeve-shifting device. Once the sleeve is shifted, the releasing profile on the keys comes in contact with the releasing chamfer in the shifting devices. This cams the keys in and releases them from the sleeve-shifting device’s 90° shoulder, releasing the positioning tool from the shifting device. * This Halliburton Lower Isolation Assembly is part of a Single-Trip Multizone (STMZ) Completion System. It is used along with a multi-position tool (MPW) and other accessories to perform gravel-pack operations on a single trip. The lower isolation assembly contains weeping ball seat and a ported seal mandrel. The tubing adapter on the upper end of the assembly has an option of adding an o-ring and seal to isolate the ports in the sealbore if needed. Multiple zones may be commingled and produced or may be selectively produced depending on the production seal unit configuration. The weeping ball seat allows a metered amount of fluid to escape past the ball, limiting the buildup of pressure differential and preventing a hydraulic lock that swabs the formation as the MPT tool is raised. * Here is a list of Multi-Zone completions that Halliburton has run. Up to the date that this was compiled, Halliburton has run 248 wells, pack

文档评论(0)

1亿VIP精品文档

相关文档