华能岳阳电厂二灰坝软基滑坡机理及加固技术研究-建筑与土木工程专业论文.docxVIP

华能岳阳电厂二灰坝软基滑坡机理及加固技术研究-建筑与土木工程专业论文.docx

  1. 1、本文档共110页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
华能岳阳电厂二灰坝软基滑坡机理及加固技术研究-建筑与土木工程专业论文

工程硕士学位论文 工程硕士学位论文 ABSrRACT ABSTRACT Second··ash--dam of Yueyang Huaneng electrical power station is located on 16m clay foundation.Since 1986,landslides always happen in the second—ash—dam,which interrupting the production.Combined with the soft soil reinforcement project in the Second·-ash·-dam of Yueyang Huaneng electrical power station,the theories and construction arts of soft soil reinforcement were studied comprehensively,combined with the research method of sites tests,laboratory tests,and numerical simulation.The main content about this dissertation are followings: (1)The slope stability analysis methods were analysised and summarized, and then classed it into the qualitative analysis method,the quantitative analysis method and the new method three kinds,and the basic principle,the virtues or defects and suitable condition of each method were pointed out at last. (2)From aspects of landform physiognomy,geologic structure and stratum lithology,ground water,earthquake effect,soil layer characteristic and SO on analyzed the engineering geology conditions in Second··ash--dem soft base landslide,and combined with lab and sites tests to determine the phygics mechanical properties modulus of each soil layers. (3)This paper adopts limit equilibrium theory to analyze stability of the Second—ash-dem,and set up foundation for analyzing slope mechanism. (4)Finite element analysis method is applied to analysis deformation behaviors and regularities of stress distribution of the Second·-ash··field dam before and after reinforcement.The finite element model simulates the deforming process of Mixing Pile and soil when loaded,discloses the load transfer mechanism between the pile and soil,and evaluates the stress trait and reinforcement effect of Mixing Pile. KEY WORDS soft soil reinforcement,composite foundation,Mixing Pile,field test,limit equilibrium,finite element analysis 原创性声明本人声明,所呈交的学位论文是本人在导师指导下进行的研究工作及取得的 原创性声明 本人声明,所呈交的学位论文是本人在导师指导下进行的研究工作及取得的 研究成果。尽我所知,除了论文中特别加

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档