- 1、本文档共51页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
互感器自动检定系统交互接口的设计与实现-系统工程专业论文
华 中科 技大学
华 中
科 技
大
学 硕
士
学 位
论
文
II
II
Abstract
With the fast development of our country’s electric power business, the current transformer, as one of the most widely used equipment in power system, becomes more and more important. However, the current transformer’s performa nce indicators including error, angular, insulation and compression have a great influence on the safety and reliability of the power system. Since the current power system transformers are manually tested now and a lot of manpower and material resources have been wasted on duplicated operating, the State Grid EPRI cooperated with the North China Power Grid, intends to develop a fully automated testing system. The low-voltage current transformer automatic verification system can implement intelligent stora ge, automatic storage, automatic test, which will greatly improve test efficiency and test accuracy.
Based on this background, in the process of developing this system, the interaction
between the integration platform and the transformer automatic test system interface has been studied in depth and the design and implementation has been introduced. This thesis analyzes and summarizes the previous transformer test methods, especially the work of domestic scholars on the realization of the transformer automatic verification system, followed by the details of the objectives of the verification system in accordance with the requirements of the actual project. The interface system is designed to be a Web Service project with an inner database; Key technologies used in the project are: XML parsing, data manipulation, Web Service. The entire process to build an interface function, which will show the other interface implementation process and methods, is introduced. Finally, a test program to test the business process of the system is developed.
Keywords: Current Transformer Automatic Verification Interface Interchange Web Service
III
III
目 录
摘 要 I
HYPERLINK \l _bookmark0 AbstractII
HYPERLINK
您可能关注的文档
- 基于《中国分类主题词表》的旅游本体知识库研究与实现-软件工程专业论文.docx
- 华泰财产保险有限公司交强险经营亏损原因分析及对策研究-保险学专业论文.docx
- 基于apdl的联合循环汽轮机转子热应力计算及启动优化的研究-热能工程专业论文.docx
- 基于android和无线网络的实时视频监控系统-计算机技术专业论文.docx
- 厚度补偿式叶绿素仪研制-精密仪器及机械专业论文.docx
- 基于android的嵌入式互动教学平台的研究与设计-软件工程专业论文.docx
- 基于android平台的移动网络自适应高画质医学视频传输系统的研制-生物医学工程专业论文.docx
- 基于ansys的涡轮增压器转子系统动力学特性研究-机械工程专业论文.docx
- 互通式立体交叉分、合流端关键技术指标研究-道路与铁道工程专业论文.docx
- 基于arcgis的北美地区臭氧时空特征分析-地图制图学与地理信息工程专业论文.docx
文档评论(0)