- 1、本文档共90页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
非一致性洪水对南宁防洪工程体系防洪能力的影响研究水工结构工程专业论文
万方数据
万方数据
11
THE
THE EFFECTS 0F lNCONSISTENCY FLOOD ON FLOOD CONTROL CAPACITY OF NANNING FLOOD CONTROL
ENG矾EER矾G SYSTEM
ABSTRACT
Due to the influences of climatic variations and human social activities, Yujiang River Basin has occurred remarkable changes on the underlying surface and the observed flood time series are no longer satisfying consistent assumption.Taking Nanning Flood Prevention Project System as research object, this paper discusses the influences of inconsistent flood on the flood prevention ability of Nanning Flood Prevention Proj ect System SO as to provide technical support for the flood-prevention dispatching rule adjustments of Nanning Flood Prevention Project System under the condition ofunderlying surface changes.
Firstly,if the observed flood time series of Baise Hydrology Station and
Nanning Hydrology Station satisfy consistency is inspected.The trend components and jump components of the time series are separately inspected. Integrating each method to inspect the performance and analyzing with physical
factors of each area,this paper confirms that Baise’S flood peak discharge, maximum 7 days’flood volume and Nanning’S maximum 7 days’flood volume as well as the time series of Baise-Nanning interval maximum 7 days’flood
volume occur trend variability;Nanning flood peak and Baise-Nanning interval
flood peak time series occur jump variability and the variability points are both in 1986.
Secondly,in accordance with the inspect result of variability,the decomposition and synthesis method based on random time series is adopted toward trend variability and the method based on Mixture Distribution Hypothesis is adopted toward jump variability forms to conduct the frequency calculation and analysis of inconsistent flood time series separately.The
万方数据
万方数据
obtained
obtained results are compared with the original time series frequency regardless of variability.The result indicates that the flood reducing phenomenon is relatively obvious as the river
您可能关注的文档
- 公路边坡降雨灾害评价方法与指标研究道路与铁道工程专业论文.docx
- 单周期产品两级供应链合作机制的研究管理科学与工程专业论文.docx
- β氨基丁酸提高烟草幼苗抵御高温和高盐胁迫的初步研究应用化学专业论文.docx
- 电子废弃物回收网络体系的研究环境工程专业论文.docx
- 大学生心理适应能力状况研究马克思主义理论专业论文.docx
- 动态车队管理问题的模型及算法研究交通运输规划与管理专业论文.docx
- 电子废弃物回收网络体系的分析人文地理学专业论文.docx
- 独立式小型风力发电机及其控制器的研究电力电子与电力传动专业论文.docx
- 苯甲酸阿格列汀的合成工艺研究及有关物质合成医学专业论文.docx
- 复杂网络中社团检测技术研究计算机软件与理论专业论文.docx
文档评论(0)