- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
实用标准文案
精彩文档
Multiple choices
The rapid application development model is Answer:c
Another name for component-based development.
A useful approach when a customer cannot define requirements clearly.
A high speed adaptation of the linear sequential model.
All of the above.
Which of the following is not necessary to apply agility to a software process?
Eliminate the use of project planning and testing
Only essential work products are produced
Process allows team to streamline tasks
Uses incremental product delivery strategy Answer:a
How do you create agile processes to manage unpredictability?
Requirements gathering must be conducted very carefully
Risk analysis must be conducted before planning takes place
Software increments must be delivered in short time periods
Software processes must adapt to changes incrementally
Both c and d
Answer: e
To construct a system model the engineer should consider which of the following restraining factors? Answer: e
assumptions
budget
constraints
schedule
both a and c
During business process engineering, three different architectures are examined. Answer: a
applications, data, technology infrastructure
communications, organization, financial infrastructure
network, database, reporting structure
systems, requirements, data structure
Which of the following is not one of the context-free questions that would be used during project inception?
What will be the economic benefit from a good solution?
Who is against this project?
Who will pay for the work?
Who will use the solution?
Answer: b
During the process of modeling the system in context, systems that interact with the target system are not represented as Answer: d
Peer-level systems
Subordinate systems
Super-ordinate systems
Working systems
6. In transaction mapping the first level factoring results in the Answer: b
您可能关注的文档
- 18春东财人力资源管理系统在线作业三(随机).doc
- 18春东财组织行为学在线作业二(随机).doc
- 18春东财组织行为学在线作业三(随机).doc
- 18个古今中外感人地宽恕故事.doc
- 18教师党员自我评价与衡量.doc
- 18秋东财公共部门人力资源管理系统在线作业三(随机).doc
- 18秋东财公共部门人力资源管理系统在线作业一(随机).doc
- 18秋东财管理系统学B在线作业二(随机).doc
- 18秋东财人力资源管理系统X在线作业三(随机).doc
- 18秋东财人力资源管理系统在线作业二(随机).doc
- 2025新人教英语四年级上册Unit 6 Changing for the seasons Part B 第5课时 Let's learn&Do a survey 课件.ppt
- 2.问题提出(1) 课件 2025西师大版数学二年级上册.ppt
- 3.第1课时 画线段 课件 2025西师大版数学二年级上册.ppt
- 10.1 人类社会的存在和发展 课件 高教版中职思想政治哲学与人生.ppt
- 8.2 明辨是非,追求真理 课件 高教版中职思想政治哲学与人生.ppt
- 2025新人教英语四年级上册Unit 4 Helping in the community Part B 第6课时 Read and write 课件.ppt
- 2.问题提出(2) 课件 2025西师大版数学二年级上册.ppt
- 2025新人教英语四年级上册Unit 6 Changing for the seasons Part A 第3课时 Let's spell 课件.ppt
- 8.1 透过现象认识本质 课件 高教版中职思想政治哲学与人生.ppt
- 第2课时 年、月、日知多少 课件 2025西师大版数学二年级上册.ppt
文档评论(0)