英文摘要Abstract
英文摘要
Abstract
Basing on the study of construction claim,this thesis applied some theory synthetically such as systems engineering theory,extension theory,network analysis, utility theory,game theory’state equation etc.Aiming at contractor claim,this thesis discuss a series of claim question about contractor,for example:how to find claim
opportunity,how to decision—making claim event,how to calculate claim value,how
to counter claim,etc.
First,according to systems analysis theory,claim system’characteristic, composing of claim system and the dynamic connection of claim system factor were discussed.In order to achieve these research purposes,this thesis analysis the causation of contractor claim.The concept of contract state was introduced.Then,the
formation of the four-contract state was analyzed.According to the model of contract—state—changing controlment,the static model of claim/claim oppunity and the dynamic controlment model of contract state were established.Second,Based on the game theory the contractor and the owner claim dynamic games model was
established.The Subgame Perfect Nash Equilibrium of the dynamic game were
analysied under different conditions,SO how the contractor made decision under different condition was settled.At the same time,the claim decision—making matter—element model of contractor was established after the relativity between claim
’event attributes and contract was discussed.Using an engineering example,this thesis discussed that contractor how to decide claim events can claim|claim events
call’t claim/claim unknown.Third,this thesis confirms how much contractor claim to ownen For construction time claim the kind of time delay was analyzed.Combined network analysis method,new time parameters were introduced.Hereon,this discourse setups variables reflecting activity delay and variables reflecting the contribution of activity delay to construction time.Then,this paper confirm which activity bring on construction time delay
您可能关注的文档
- 建设工程担保制度的理论与实证研究-建筑与土木工程专业论文.docx
- 建设工程的质量管理问题研究-项目管理专业论文.docx
- 建设工程低价中标问题及标后管理-建筑与土木工程专业论文.docx
- 建筑安全技术的经济性研究-管理科学与工程专业论文.docx
- 建筑安全经济激励机制研究及其绩效评价管理科学与工程专业论文.docx
- 建筑安全生产分级监管方式的研究-技术经济及管理专业论文.docx
- 建筑安全生产管理体系分析-建筑与土木工程专业论文.docx
- 建设工程定量评标与决策支持系统的研究-管理科学与工程专业论文.docx
- 建筑安全生产管理体系研究-建筑与土木工程专业论文.docx
- 建筑安全生产许可动态管理-工程管理专业论文.docx
最近下载
- NBT 31084-2016 风力发电工程建设施工监理规范.docx VIP
- 《富贵不能淫》课件.ppt VIP
- 《工程勘察服务成本要素信息(2022版)》.docx VIP
- 一级烟草专卖管理师理论考试题库(含答案).pdf VIP
- 【市质检】泉州市2025届高中毕业班质量监测(二) 政治试卷(含答案解析).pdf
- 2025年计量经济考试试题及答案.doc VIP
- 安装工程实施方案.docx VIP
- 2023年工商银行校园招聘笔试试题含答案.pdf VIP
- 八上23《孟子》三章-得道多助,失道寡助 课件(共32张PPT).pptx VIP
- 量化方法培训课件:可转债K线技术分析与K线形态因子.pdf VIP
原创力文档


文档评论(0)