- 2
- 0
- 约4.94千字
- 约 4页
- 2019-03-01 发布于天津
- 举报
侧向激振下桩身完整性试验新方法探讨-世界地震工程
25, 4 Vol. 25, No. 4
2009 12 W ORLD EARTHQUAKE ENGINEER ING Dec. 2009
: 100 - 6069( 2009) 04- 0141- 04
1, 2 1 2
苗永红 , 刘松玉, 顾建祖
( 11 , 210096; 21 , 212013 )
: ,
,
,
, ,
: ; ; ;
: TU43; P31519 : A
The new m ethod of p ile in tegrity testing w ith lateral ex citation
1, 2 1 2
M IAO Yonghong , LIU Songyu , GU Jianzu
( 11 Institute of Geotechnical Engineering, SoutheastU niversity, Nanjing 210096, China;
2 1Faculty of Science, Jiangsu University, Zhenjiang 212013, China)
Abs tract: P ile Integrity Testing has an mi portant sign ificance in civil engineering. For concrete pilesw ith lateral
excitation, its reflectionw aveform characteristics is analyzed and a new m ethod for pile integrity testing is proposed.
In the paper first reinforced concrete beam specmi en is smi ulated as amodel p ile indoor, and then in the project it
w ill be tested by th is new m ethod. A comparative analysis is carried out by using the method and the traditional e-
lastic reflectionw avem ethod for verifying the effectiveness of the new methodw ith lateral excitation. A reliable new
means is provided for p ile quality testing.
K ey w ord s: lateral excitation; Pile Integrity; tes;t new m eans
, ,
,
[ 1]
,
, ,
, , , ,
56
[ 2]
, , ;
, ,
,
: 2008- 0 - 16; : 2009- 11- 02
: ( 19 3- ), , , 1E-m ail: yhm iao1998@ 1631 com
142
您可能关注的文档
最近下载
- Ф90橡胶冷喂料挤出机毕业设计说明书.docx VIP
- 《行测》《行测》题库型介绍(基础题).docx VIP
- 北师大五年级下册全册数学教案.docx VIP
- 石蜡制备高碳醇工艺条件研究.pdf VIP
- 2025届宁夏回族自治区吴忠市盐池县高三下学期第一次模拟考试物理试卷.pdf VIP
- 浙江省中小学正高级教师职称评审表2017.pdf VIP
- 80辛集互联网搜索引擎在成功抓获漂白身份潜逃十二年绑架逃犯中的具体应用3542.pdf VIP
- 《故宫IP联名文创产品开发与销售总结》_国潮文创产品经理.docx
- 人教版(2019)必修第一册 Unit 3 Sports and Fitness Reading and thinking Living Legends 教学设计.pdf VIP
- 专题01+完形填空之综合解题技巧(复习课件)(全国通用)2026年高考英语二轮复习讲练测.pptx VIP
原创力文档

文档评论(0)