外文翻译墨累河船闸设计.docxVIP

  • 8
  • 0
  • 约2.19万字
  • 约 14页
  • 2019-02-26 发布于广东
  • 举报
4500汉字,2900单词,1?4万英文字符 The lock design of River Murray River Murray Navigation The weirs and locks were originally constructed on the River Murray in the 1920s and 1930s to provide year-round navigation for commercial cargo and passenger paddle steamers. They were generally built too late to be of benefit to the river trade, as the development of railways and the growth of motorized road haulage had overtaken river transport. Today there are 13 navigation locks on River Murray weirs and two locks on the barrages at the Murray mouth. They are maintained and operated for the Murray-Darling Basi

文档评论(0)

1亿VIP精品文档

相关文档