- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
课件:药品GMP培训(清净厂房及空气系统).ppt
This slide shows a series of tests to be carried out during qualification. There are different tests for the turbulent and for the uni-directional air flows. The differential pressure on filters is an indication of the clogging of the filters: with the charging of dust on the filters, the differential pressure will increase. In order to keep the volume of air constant, the fan speed may increase, with the following consequences: Damage to filters, and passage of unfiltered air Particles and micro-organismes will be “pushed” through the filter units. (Inspectors should check whether pressure differential manometers are installed on the AHUs. Without this means of monitoring the filters, the system could go out of control causing contamination problems.) Airflow patterns are interesting to visualize (smoke tests), as zones without proper flushing can be easily identified. It is also important to monitor air flow velocities for each HEPA filter according to a program of established intervals because significant reductions in velocity can increase the possibility of contamination, and changes in velocity can affect the laminarity of the airflow. Airflow patterns should be tested for turbulence, as these can interfere with the flushing action of the air. The recovery time (clean-up time) is also an important parameter to be determined. Once doors have been opened and people have been entering a room, the original conditions have been disturbed and, for a short while, before recovering, the room does not always correspond to the laid down parameters.It is important to know how long this period is. There are no regulations laid down as to how long this clean-up time should be. However, the generally accepted time to clean-up from one cleanroom classification to the next higher classification, should be less than 15 minutes. It should also be remembered that a room is to be qualified “in operation” when it has a certain number of people in it. After
您可能关注的文档
最近下载
- 江苏开放大学公文写作与处理050008过程性考核作业三.docx VIP
- 运维规范试题.docx VIP
- 《先进纺织技术》课件.ppt VIP
- 2025秋数学人教二年级(上) 身体上的尺子:第1课时 身体上的长度.pptx VIP
- 保定动力19秋网络运维班知识测试_A.docx VIP
- 高速铁路概论单元四第节高速铁路通信课件.pptx VIP
- HFC网络(光机及以下)调试运维培训试题.docx VIP
- 化学-海南省天一大联考2023-2024学年高三学业水平诊断(二)带答案.docx VIP
- 高考数学培优---椭圆、双曲线的焦点弦被焦点分成定比.docx VIP
- 福建省电子技术基础应试指南测试卷答案.docx VIP
原创力文档


文档评论(0)