- 1、本文档共34页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Progress of BRIF and CARIF Weiping Liu 柳卫平 中国原子能科学研究院 China Institute of Atomic Energy, CIAE October 14, 2010 International symposium on nuclear physics in Asia Beihang University Major facilities of nuclear physics in China Few words about CIAE China Institute of Atomic Energy Established in 1950, multi-disciplinary national lab for nuclear science, JAEA like, 30 km SW of downtown Nuclear physics, basic research Nuclear chemistry, nuclear fuel cycle technology Reactor engineering and more, Nuclear application, application of nuclear science Uniqueness Large scale facilities, reactors, accelerators, hot labs Multiple field of nuclear science Connection between research and industry What is BRIF and CARIF Both in CIAE BRIF: Beijing Rare Ion beam Facility, under construction, will be commissioned in 2013, ISOL type CARIF: China Advanced Rare Ion beam Facility, proposed, in combination of ISOL and PF technique ISOL and PF ISOL For precise physics with high quality beams Advanced target and ion source technology needed Few operational, many proposed, ISAC, REX-ISOLDE, HRIBF, etc BRIF PF For physics of extreme iso-spin Using in-flight separation method Currently used in many facilities, e.g., MSU, GANIL, CSR, RIBF, FRIB, and FAIR BRIF (Beijing Rare Ion beam Facility) Project milestone Evaluation in 1997 Project approved in 2003 Feasibility plan approved ($27 M) in 2004 Revised feasibility plan submitted in 2008 Revised feasibility plan got permission in Aug. 2009 ($52 M) New parts after the Tandem Cyclotron Cyclotron progress ISOL progress BRIF upgrade BRIF summary Cyclotron: magnet rough finished, with detailed fabrication finished ISOL: magnets finished, target-source area in progress SC LINAC: design finished, all the fabrication in progress Civil engineering will start by the end of the year Will deliver to user in 2013 The follow up SC LINAC for NYU may be operational in 2014 CARIF proposal China Advanced Rare Ion-beam Facility Frontier of nuclear physics and fa
文档评论(0)