基于系统动力学的工程项目成本控制方法分析-土木工程专业论文.docxVIP

基于系统动力学的工程项目成本控制方法分析-土木工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Ab Abstract I II THE RESEARCH ON PROJECT COST CONTROL METHOD BASED ON SYSTEM DYNAMICS ABSTRACT Economic globalization is an inevitable trend of development in the world, so Chinas construction market is more competitive with the impact of international companies. Controling costs reasonable in order to maximize benefits not only the pursuit of the goals of the enterprise, but also the fundamental of enterprise survival and development. For large engineering construction projects, cost management is a complex process. The time has passed to control costs alone on experience, the factors are interrelated .Considering the factors that affect the cost of system dynamic ,finding new method of project cost control depth is one direction. In the process of exploring the theory and method of construction project cost control, previous studies pay attention to theoretical guidance lack of quantitative analysis. System dynamics method has been widely applied to all areas of society, the research has also been made in the risk management of construction projects, however, the construction project cost control system has not yet commenced research. So, we try to combine system dynamics method to the theory of project cost control to modeling of project cost control system. First,the artical try to analys the main factors in the cost control system with the system dynamics method. By two main lines(feedback loop of cost variance,feedback loop of schedule variance),we find the factors of cost. Quality objectives include the integrated system of cost control in the form of rework. With the method of AHP,do research on risk analysis of Bored pile constuction process,and find that the main risk of accidents are broken the pile and into the hole is not round which cause 60% of total rework. Secondly, based on the previous analysis, we identify the main variables from the five areas of people, materials, machines, methods, environment by fishbone diagram. According

您可能关注的文档

文档评论(0)

1234554321 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档