但渡大桥缺陷桩处治及承载力估计.PDF

第29 卷增刊 岩 土 力 学 Vol.29 Supp. 2008 年11 月 Rock and Soil Mechanics Nov. 2008 文章编号:1000-7598 -(2008) 增刊-67 1-04 但渡大桥缺陷桩处治及承载力估计 李正荣,王 成 ﹙重庆交通大学 隧道及岩土工程系,重庆 400074 ﹚ 摘 要:缺陷桩基处理是工程建设中常见的困难问题。以但渡大桥工程出现的桩基混凝土强度等级不满足设计要求为例,以 工程规范和桩土参数经验取值为依据,提出缺陷桩基处治方案。并详细计算和分析了缺陷桩基处治前后的竖向和水平承载力 对比,为该工程处治的设计和施工提供参考依据。 关 键 词:缺陷桩基;嵌岩桩;竖向承载力;水平承载力 中图分类号:TU 473 文献标识码:A Treatment of defect pile of Dandu Bridge and calculation of bearing capacity LI Zheng-rong, WANG Cheng (Department of Tunnel and Geotechnical Engineering, Chongqing Jiaotong University, Chongqing 400074, China) Abstract: Treatment of defect pile is a difficult issue in engineering construction. Taking Dandu Bridge project as an example, in which the concrete strength of pile foundation does not meet the design requirements, and on the basis of engineering specification and empirical values of pile-soil parameters, the treatments of defect pile are proposed. The comparison between the vertical and the horizontal bearing capacities of the defect pile before and after the treatment is analyzed thoroughly; and the analysis can be used as references. Key words: defect pile foundation; rock-socketed pile; vertical bearin

文档评论(0)

1亿VIP精品文档

相关文档