- 1、本文档共20页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Test Case/Reqt Buy-Off Overview Summary All Level 2A requirements have been flowed down with traceability Verification plans have been written and reviewed extensively by the LAT team and the NASA customer Test and analysis plans are released and have had a thorough review by the LAT team and the NASA customer A requirement sell-off process has been established GLAST Large Area Telescope Gamma-ray Large Area Space Telescope LAT Pre-Shipment Review LAT Level Test Verification Process Back-up Charts Rich Baun Systems Engineering GLAST LAT Project April 27, 2006: LAT Pre-Ship Review LAT Test Verification Process Presentation 4 of 12 GLAST Large Area Telescope Gamma-ray Large Area Space Telescope LAT Pre-Shipment Review LAT Level Test Verification Process Rich Baun Systems Engineering Agenda Requirements Verification Flowdown Overview Verification Status LAT Level Test Case Overview Test case run review buy-off Requirement sell-off Requirement Verification Flowdown Requirement Verification Flowdown Discussion All NASA Level 2A reqts in the SRD, MSS, and IRD are flowed to the Level 2B LAT Perf Spec (LAT-SS-00010) All LAT reqts are flowed to Subsystem specs (Level 3) from the 00010 Recent updates to the 00010 and the L3 specs have been completed to ensure complete reqts flowdown and traceability Both the reqts and reqt flowdown is documented and maintained in DOORS NASA Systems and all LAT team members have fully reviewed these requirements and the associated flowdown All LAT Perf Spec requirement Verification Plans (VPs) are documented by the VCRM Each LAT reqt is traced to a VP in the VCRM VPs and the verification traceability is documented DOORS Test and demo VPs are logically collected to form test cases as defined by the Perf Ops Test Plan (LAT-MD-02730) Analysis VPs are allocated to the Analysis Plan (LAT-MD-07980) Environmental Requirements The environmental reqts defined in the EMI Spec and the MAR define the environments in which the LAT is te
您可能关注的文档
- Middleware Technologies课件.ppt
- Migration of a 4GL and Relational Database to Unicode课件.ppt
- Mikroprosesor &课件.ppt
- Mineral Chemistry课件.ppt
- MIS Project-沃尔玛课件.ppt
- MIS系统软件课件.ppt
- Model Checking Java Programs课件.ppt
- Modernization of Connection Performance Properties课件.ppt
- Module 1 – “Establish Performance Plan” for Managers课件.ppt
- Module 4 账户与复式记账课件.ppt
最近下载
- 惠普HP M27fq QHD MonitorMaintenance and Service Guide说明书用户手册.pdf
- 第二十六届全国青少年信息学奥林匹克联赛初赛模拟试题附有答案.docx VIP
- 《资产评估实务》课程教学大纲.pdf
- 第二十三届全国青少年信息学奥林匹克联赛初赛含答案(WORD重新整理排版).doc VIP
- 《经络腧穴》考试复习题库(含答案).docx
- GB_T 41666.4-2024 地下无压排水管网非开挖修复用塑料管道系统 第 4 部分:原位固化内衬法.pdf
- 海外投顾代表之CharlesSchwab.pdf VIP
- 市医保DRG付费政策要点解读.pptx
- 16-实变函数论与泛函分析(上册·第二版修订版)-夏道行--2010.pdf VIP
- 中学化学课题立项申请书 《基于核心素养背景下的化学试题命制策略研究》.doc
文档评论(0)