黄河铁谢工程弯道改造刍议文档
Discussion about transformation of curve conduit of Yellow river Tie xie project
Liu you zhan
( western he nan Yellow River Affairs Bureau)
Abstract: Tie xie project was passively built due to rush to deal with emergency, it is separated to two up-down bend in north gate dam (number 10 dam). Until last 70 centuries, stuff and descend projects were respectively built in up and down the dam. Though the building of projects cann’t transport downstream the 10 dam, it was suited to temporal water-sediment conditions, the river was in a perfect condition. After the “96.8” flooding, the Tie xie proj