煤矿岩石高边坡稳定性分析及其工程应用-岩土工程专业毕业论文.docxVIP

煤矿岩石高边坡稳定性分析及其工程应用-岩土工程专业毕业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
安徽理-l=大学硕士学位论文Abs仃act 安徽理-l=大学硕士学位论文 Abs仃act The problem of slope stability relates to field about mine engineering,road and bridge engineering,hydraulic engineering,construction engineering and SO on.As gradual increasing to energy demand and national economic development,slope stability has become one of focal points and is remarked by more and more people in our gcotechnical engineering construction.Stability analysis and treatment of hi曲 slope becomes one critical segment of engineering success-fail.If treating is inappropriate,it results in slope destabilization and geological catastrophe like landslipe,slide is formed. Based On detailed geological reconnaissance,first-hand data is obtained against the landslide status ofFengyu Oou coal mine slope ofXishan Electric Coal Croup.The slide stability is analysed to the typical gross section We selected in this paper,which uses the quantitative and qualitative method.An economic security reinforcement method is designed on basis of the analysis results.Fissure produce and development are restrained by Polypropylene fiber concrete spray-up that has the features of impervioUS,crack resistance and tensile resistance and has the aniform stress distribution,small Stress value and good non·deformability.Due to the common concrete spray-up has the small tensile strength and bad impermeability,the polypropylene fiber concrete spray—up is put forward.Indoor mechanical property test is finished. Reinforced programme of anti·slide pile, anchorage cable and polypropylene fiber concrete spray-up is designed against type section of Fengyu Oou COal mine. According to geological regularities of distribution and presentation character of site deformation,typical analytical sections are selected and physical mechanical parameter test of rock is accomplished;Stability factor of selected slope is calculated through the unbalanced force transfer coefficient method is applied;bases on applying lagrangian analysis namely the proce

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档