超高层全钢动轨式附着升降脚手架施工技术
常子博;赵卫卫;宋大帅;嘉兆亮;高凯
(中建三局第二建设工程有限责任公司,湖北·武汉,430074)
[摘要]以太原茂业超高层写字楼为例,介绍了全钢动轨式附着升降脚手架的布置、安装、分片整体提升及安全控制措施等,提出了全钢动轨式附着升降脚手架在超高层建筑中的良好应用。
[关键词]超高层;全钢动轨式附着升降脚手架;分片整体提升;
Construction technology of high rise full steel movable rail type attachment and lifting scaffold
(The Second Construction Co., Ltd. of China Construction Third Engineering Bureau, Wuhan, Hubei 430074, China)
Abstract:Taking the super high-rise office building in TaiyuanMaoye as an example, this paper introduces the layout, installation and safety control measures of the whole steel movable rail mounte