- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Research
Research and Application of Pavement Prediction Model
and Optimization Model
Ab stract
Pavement management system is an efficient tool that help highway administrative departmentto make full use oflimited resource,
in the hope of providing proper service level of roM surface for road
usef.Pavement performance prediction models and optimization model is the important component of the pavement management system·The realization of performance prediction models and optimization model is the key of the development of the pavement managerrent system.
Pavement performance prediction model based on neurN network is founded and realized in the pavement management system The algorithm is described clearly in this paper.The model overcomes
some traditional insufficiencies such as the model being apt to deviate aIld wrong because of the selection of parameter Three optimization models are used to make pavement maintenance need plan is founded·
Three models have different restriction which include maintenance
standard being specified,maintenance level of road network being specified and the maintenance cost being specified.Algorithms of three models are also described clearly in this paper.These algorithms resolve the optimum investment problem of pavement maintenance within 80me
specified
specified area and specified years.Test results using practice data V耐匆
the feasibility ofthese algorithm金
The author combine the idea that some sub territory carl be ignored in the 0-1 integer programming algorithm and the algorithms
own character to optimize the algorithm of specified investment.As a
result.the mn speed is improved greatly.The concept of group element is first used in variable keys and the referenced algorithm is presented as for integer programming algorithm with the specificrestricted function
【KEYWORDS】Pavement performance prediction;optimization model;pavement management system;radial basis neural network;O-1 integer programming algorithm;investment limitation
您可能关注的文档
- 利率市场化与我国商业银行利率风险管理-经济思想史专业论文.docx
- 沈阳公和斜拉桥的荷载试验研究-桥梁与隧道工程专业论文.docx
- 跨国公司知识管理的模式与创新-技术经济与管理专业论文.docx
- 六品水彩——水彩画境界探微-美术学专业论文.docx
- 沈阳市装备制造业竞争力研究-区域经济学专业论文.docx
- 颅内消淤汤在颅脑外伤治疗中的价值-神经外科学专业论文.docx
- 矿业开发密集地区景观格局及动态研究-采矿工程专业论文.docx
- 立克次体分子生物学检测方法建立及云南红塔立克次体感染情况调查-病原生物学专业论文.docx
- 论职业院校英语专业学生的语用能力培养-英语语言文学专业论文.docx
- 利用信托解决城市基础设施建设融资问题-金融学专业论文.docx
原创力文档


文档评论(0)