- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
汽车gps防盗系统跟gsm防盗系统有什么区别资料文档
The Lean Enterprise Introduction to TPM – Total Productive Maintenance Learning Objectives Learn the basic philosophy of TPM Explain OEE and how it contributes to a TPM project, explore OEE components; define and calculate OEE List 6 major components of equipment loss Review and adopt the 7 steps to Autonomous Maintenance TPM – The Need Process Industry relies heavily on equipment that is integrated and runs continuously When down, losses are costly With lower inventories, machines need to be reliable Machining and Assembly industries becoming more mechanized to save manpower and do difficult jobs More machines to maintain Need to save energy TPM – The Philosophy TPM aims at using equipment to its maximum and aids in reducing Life Cycle Costs (LCC) In other words - going all out to eliminate the Losses (Waste) caused by the equipment TPM improves work activities that deal with Equipment Set-up, Operating parameters, Maintenance, Tear down, Repairs and Breakdowns It specifically aims at the complete elimination of the ‘six major losses’ while striving for a goal of zero unscheduled downtime TPM - The Six Major Losses (Waste) Downtime Losses (1) Equipment failures (2) Set-up and adjustments Speed Losses (3) Idling and minor stoppages (4) Reduced speed (actual operating vs. designed) Defect Losses (5) Defects in process (6) Reduced yield between start of production and stable production OEE Formulas TPM attacks 6 major “Losses” plus Elimination of other Wastes (Mura, Muri, Muda) Operator Time Losses Manpower losses due to operation time being done more slowly than standard time (Cycle Time Standard Time) Material Losses Losses in yield due to ‘inherent waste’ (cut-off stock, set-up pieces, prototype, etc) Energy losses such as electricity, gas, and water when machinery is not doing value-added work Idling losses due to inadequate sensors and product buildup on conveyors and chutes Best PracticesWorld-Class Goals (A TPM “V
文档评论(0)