沈阳市66kV高压配电网规划研究-电气工程专业论文.docxVIP

沈阳市66kV高压配电网规划研究-电气工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
哈尔滨工业大学工程硕士学位论文 哈尔滨工业大学工程硕士学位论文 - - II- Abstract Distribution network planning is the important constituent of Power System Planning,The quality of Distribution Network Planning can directly affect the safety and stable operation of Distribution Network.Therefore,doing distribution planning well which is significant to the economy and power company.As the mid grid of Shenyang ,66kV grid takes the role of receiving power from high voltage and distributing power to low voltage distribution networks. Combining with the actual situation of Shenyang grid,this paper makes a systemtic plan. Firstly,in premise of analyzing the situation of shenyang grid,two diffierent methods ,respectively the method of moving average and BP neural network ,are used for load forecasting.The results of two methods are compared with the history data.The conclusion is that BP neural network is much better. Secondly,the coordination between 66kV with 10kV and 20kV of shenyang grid is compared on the density of load,power supply and voltage quality.The principles and constraints of voltage coordination are definited. combining with the actual situation of Shenyang grid, two models of voltage coordination are framed.The results are analyzed and evaluted on technique and economy. Finally,combining with the results of load forecasting,the transform balance and load balance of shenyang 66kV grid are analyzed.Considering the problems and difficulties of shenyang distribution grid,a model of considering minimum cost is proposed to determine the locations and capacities of transformer substations.On the basis of defineding the locations and capacities of transformer substations,the model of net Structure planning on PSO algorithem is established and the optimization routes are completed.The electrical calculation is made at last which demonstrate the rationality,security and forward-looking of this plan. Keywords: 66kV distribution network, load forecasting, voltage coordination, network planni

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档